W26.45-1369-09
1 | Power take-off 1 | 7 | Transmission | S2 | Power take-off 1 indicator switch | ||
2 | Oil pump housing | 8 | Pressure relief valve with bypass valve (only on vehicles with code N6Z (Transmission cooling)) | Y8 | Power take-off 1 solenoid valve | ||
3 | Roll pin | 9 | Pressure relief valve (only on vehicles without code N6Z (Transmission cooling)) | Y8a | Power take-off 1 solenoid valve with shift lock | ||
4 | Oil pump gear (driven) | 10 | Electrical connection (PTO indicator switch) | A | Pin | ||
5 | Oil pump gear (powered) | 11 | Electrical connection (PTO solenoid valve) | B | Markings | ||
6 | Seal | 12 | Compressed-air line |
Topical note | Notes on self-locking nuts and bolts | ||
| Remove/install | ||
1 | Unpressurized circuit 4 of compressed-air system | ||
2 | Drain transmission oil from power take-off | ||
| Model 963, 964 | ||
| Model 967 | ||
3 | Remove output flange from transmission (7) |
| |
4.1 | Remove drive shaft from power take-off 1 (1) | With power take-off (1) with propeller shaft | |
Propeller shaft to power take-off | |||
4.2 | Remove hydraulic pump | With power take-off (1) with hydraulic pump | |
Do not separate hydraulic lines if possible, collect hydraulic fluid if necessary. | |||
5 | Remove power take-off 2 | Only for power take-off 125-11b/2c or 125-11c/2c. | |
Installation: Replace seal. | |||
6 | Disconnect electrical connector (10) from power take-off 1 indicator switch (S2) | Mark the installation location of the electrical connector (10). | |
Installation: Observe the marking for the electrical connector (10). | |||
7 | Disconnect electrical connector (11) from power take-off 1 solenoid valve (Y8) or from power take-off 1 solenoid valve with shift lock (Y8a) | Mark the installation location of the electrical connector (11). | |
Installation: Observe marking for electrical connector (11). | |||
8 | Detach compressed air line (12) from power take-off 1 solenoid valve (Y8) or from power take-off 1 solenoid valve with shift lock (Y8a) |
| |
Model 967 | |||
9 | Detach air lines and electrical wiring harness with bracket from power take-off 1 (1) and place to one side | Bolt, power take-off to transmission | |
10 | Unscrew screws/bolts from power take-off 1 (1) and remove power take-off 1 (1) | Secure power take-off 1 (1) against falling down. The pressure relief valve with bypass valve (8) and the pressure relief valve (9) are under tension. | |
Installation: On vehicles with code N6Z (Transmission cooling), the pin (arrow A) of the pressure relief valve with bypass valve (8) must be in "9 o'clock" position. | |||
Bolt, power take-off to transmission | |||
11 | Remove oil pump housing (2), oil pump gear (driven) (4) and oil pump gear (powered) (5) | Only when exchanging transmission or retrofitting a power take-off. | |
Installation: | |||
Installation: The markings (arrows B) on the oil pump gears (4, 5) must point toward the transmission (7). Lubricate oil pump gears (4, 5). | |||
12 | Pour in transmission oil and correct transmission oil level | ||
| Model 963, 964 | ||
| Model 967 | ||
13 | Install in the reverse order |
Referenced documents
- ah0000n000101a Notes on self-locking nuts and bolts
- ap2600w2601h Manual transmission - oil change
- ap2600w2601k Manual transmission - oil change
- ar2645w0002ca Remove/install hydraulic pump
- ar2645w0009c Remove/install power take-off 2
- ar2650w2000hc Remove/install transmission output flange
- ar4210w0900h Remove/install compressed air connector coupling
- ar4210w0900na Remove/install compressed air connector coupling