ar6125p6600ew

Remove/install bulkhead

Type ar · emne 61.25 · version 0201 · 2014-03-14

Gælder for: MODEL 212 with ENGINE 274 MODEL 212 with ENGINE 276.8 MODEL 212.095/195 with ENGINE 276.9

Ikke tilgængelig på “da”; vises på Engelsk.

Placering

Funktionsgruppe 3 Karrosseri › 61 Undervogn › 61.25 Undervognsstel — Serie 212

EinPAS 35 Karrosseri/ramme/monteringsdele › 35.32 undervogn › 35.32.35 bundgruppe/undervogsstel — Serie 212

Gælder også for motorer/gearkasser: 274 ***, 276 8**, 276 9**

AR61.25-P-6600EW

Remove/install bulkhead

10.03.2014

MODEL

212 with ENGINE 274

MODEL

212 with ENGINE 276.8

MODEL

212.095/195 with ENGINE 276.9

Remove/install bulkhead

Shown on engine 276.9

1

Bulkhead

2

Weather strip

3

Electrical line

4

Cable duct

5

Vacuum line

7

Bracket

9

Electrical wiring harness

10

Cable duct

22

Bracket

F32

Front electrical prefuse box

P61.25-2036-05

Remove/install bulkhead

P61.25-2034-09

Shown with engine 276.9 removed

1

Bulkhead

13

Screw

9

Electrical wiring harness

14

Insulation mat

10

Cable duct

15

Right heat shield

11

Coolant hose

16

Left heat shield

12

Coolant hose separating point

Remove/install bulkhead

Shown on ENGINE 274

1

Bulkhead

2

Weather strip

3

Electrical line

4

Cable duct

5

Vacuum line

9

Electrical wiring harness

10

Cable duct

P61.25-2037-05

Remove/install bulkhead

Shown on engine 276.8

1

Bulkhead

2

Weather strip

3

Electrical line

4

Cable duct

5

Vacuum line

9

Electrical wiring harness

10

Cable duct

22

Bracket

P61.25-2038-05

Remove/install bulkhead

P61.25-2035-08

Shown with engine removed

1

Bulkhead

19

Screw

15

Right heat shield

20

Screw

16

Left heat shield

21

Nut

17

Nut

22

Bracket

18

Nut

Remove/install bulkhead

Shown on removed engine 274.9 with CODE 924 (Equipment for natural gas operation)

23

Electrical wiring harness

24

Bracket

25

Cable duct

Y107/2

Pressure control unit

P61.25-2039-02

Information on preventing damage to electronic components due to electrostatic discharge

AH54.00-P-0001-01A

Remove/install

1

Open engine hood and raise to vertical position

AR88.40-P-1000EW

2

Drain coolant


ENGINE 276

AR20.00-P-1142EL

ENGINE 274

AR20.00-P-1142MR

3

Disconnect battery ground line

AR54.10-P-0003EW

4

Remove edge stripping (2) from bulkhead (1)

5

Disconnect electrical lines (3) from prefuse box (F32)

AR54.15-P-1330EW

6

Pull cable duct (4) with bracket (7) upward out of bulkhead (1) and lay down to side

7.1

Unclip vacuum line (5) at front

ENGINE 276.8

7.2

Disconnect vacuum line (5) from rear separating point

ENGINE 276.9

7.3

Disconnect vacuum line (5) from cable duct (4)

ENGINE 274

8

Disconnect electrical connection from electrical wiring harness (9) on engine

9

Unhook bracket (22) from bulkhead (1)

ENGINE 276

10.1

Pull vacuum line (5) and electrical wiring harness (9) with cable duct (10) upward out of bulkhead (1) and lay down to side

ENGINE 276

10.2

Pull electrical wiring harness (9) with cable duct (10) upward out of bulkhead (1) and lay down to side

ENGINE 274

11

Disconnect electrical wiring harness (23) from pressure control unit (Y107/2)


MODEL 212 with ENGINE 274.9
with CODE 924 (Provision for natural gas operation)

AR07.17-P-0001MRC

12

Unclip electrical wiring harness (23) from bracket (24)

MODEL 212 with ENGINE 274.9
with CODE 924 (Provision for natural gas operation)

13

Pull electrical wiring harness (23) with cable duct (25) upward out of bulkhead (1) and lay down to side

14

Disconnect coolant hose (11) from coolant hose separating point (12) and lay down to side

Installation: Check seal on coolant hose (11) for damage, replace if necessary.

15

Release catch hook (arrows) on coolant hose separating point (12) and press coolant hose separating point (12) out of bulkhead (1) toward rear

16

Remove bolt (13)

Lift insulation mat (14) in area of bolt (13).

17

Unscrew bolts (19, 20)

18

Unscrew nuts (21)

19

Detach right heat shield (15) and left heat shield (16) from threaded pin on clip-on nuts (21)

20

Release nuts (17, 18)

It is not necessary to unscrew the nuts (17, 18) completely.

21

Remove bulkhead (1) upward

22

Transfer insulation mat (14)

When replacing bulkhead (1).

23

Install in the reverse order

Henviste dokumenter