W26.45-1196-09
1 | Cylindrical roller bearing (only for transmission 715.35/37/38/5) | 19 | Thrust washer | 34 | Sealing ring | ||
2 | Housing cover | 20 | Bearing housing of second output (with dual output shaft with flange) | 35 | Piston with shift rod | ||
3 | Cylindrical roller bearing | 21 | Seal | 36 | Drain screw | ||
4 | Cylindrical roller bearing inner race | 22 | Shift housing of second output | 37 | Shift fork | ||
5 | Output shaft | 23 | Shim | 38 | Compression spring | ||
7 | Oil pipe | 24 | Centering ring | 39 | Jack | ||
8 | Housing | 25 | Retaining ring | 40 | Sliding sleeve | ||
8.1 | Screw | 26 | Ball bearing | 41 | Driver | ||
9 | Seal | 27 | Shim | 42 | Cluster gear | ||
11 | Ball bearing | 28 | Screw plug | 43 | Needle roller bearing | ||
13 | Centering ring | 29 | Control plunger | 44 | Needle roller bearing | ||
14 | Shim | 30 | O-ring | 45 | Drive shaft | ||
16 | Housing cover | 31 | Shift cylinder with solenoid valve | S23 | Power take-off 1 indicator switch | ||
17 | Radial shaft sealing ring | 32 | Seal | ||||
18 | Output flange | 33 | Slide ring |
| Disassemble | ||
1 | Remove power take-off | Transmission 715.32 | |
Transmission 715.35/37/38/5 | |||
2 | Remove bearing housing for second PTO (20) | Only with double output shaft with flange. | |
3 | Disassemble bearing housing for second PTO (20) | Only with double output shaft with flange. | |
Internal extractor | |||
Counter stay | |||
4 | Remove shift housing for second PTO (22) and remove shim (23) | ||
5 | Disassemble shift housing of second PTO (22) | ||
6 | Remove output flange (18) | Counterhold output flange (18) with retainer wrench. Use puller in the event of sluggishness. | |
Retainer wrench | |||
Puller, two-arm | |||
7 | Detach housing cover (16) and remove shim (14) | ||
8 | Remove radial shaft sealing ring (17) for output flange (18) | ||
9 | Unscrew screw/bolt (8.1) | ||
10 | Remove seal (9) | ||
11 | Unscrew power take-off 1 indicator switch (S23) | ||
12 | Detach housing cover (2) | When installing new housing cover (2), also install new cylindrical pins. | |
13 | Remove cylindrical roller bearing (1) | Only with transmission 715.35/37/38/5. | |
Internal extractor | |||
Countersupport | |||
14 | Remove cylindrical roller bearing (3) | Internal extractor | |
Countersupport | |||
15 | Remove socket (39) | Internal extractor | |
Counter stay | |||
16 | Remove push spring (38) from shift fork (37) | ||
17 | Remove shit cylinder with solenoid valve (31) | ||
18 | Remove piston with shift rod (35) | ||
19 | Remove slide ring (33) and sealing ring (34) from piston with shift rod (35) | ||
20 | Push shift fork (37) to one side and remove control plunger (29) | ||
21 | Remove O-rings (30) from control plunger (29) | ||
22 | Drive out output shaft (5) using aluminum drift | ||
23 | Remove cylinder bearing inner race (4) from output shaft (5) | Puller | |
24 | Remove circlip (25) | ||
25 | Drive out input shaft (45) using aluminum drift | ||
26 | Disassemble drive shaft (45) | ||
27 | Drive out ball bearing (26) and centering ring (24) using suitable drift | ||
28 | Drive out ball bearing (11) and centering ring (13) using suitable drift | ||
29 | Unscrew screw plugs (28) and remove sealing rings | ||
30 | Remove oil pipe (7) from housing (8) | ||
31 | Assemble power take-off |
000 589 29 33 00
Internal extractor
000 589 33 33 00
Counter stay
001 589 19 33 00
Puller
000 589 35 33 00
Countersupport
000 589 68 33 00
Internal extractor
000 589 34 33 00
Counter stay
717 589 00 31 00
Retainer wrench
000 589 25 33 00
Internal extractor
000 589 88 33 00
Puller, two-arm