1 | Power take-off 123 |
2 | Power take-off 124 |
3 | Seal |
4 | Screw |
5 | Compressed-air line |
6 | Electrical connection (PTO indicator switch) |
7 | Electrical connection for PTO solenoid valve |
W26.45-1219-06
| Remove/install | ||
1 | Drain transmission oil from power take-off | ||
| Transmission 715.320 | ||
Collect transmission oil. | |||
2.1 | Remove drive shaft from power take-off | Power takeoff without hydraulic pump | |
Propeller shaft to power take-off | |||
2.2 | Remove hydraulic pump | Power takeoff with hydraulic pump | |
3 | Remove compressed-air line (5) from solenoid valve. | Installation: Install new seals. | |
4 | Disconnect electrical connections (6, 7) | ||
5 | Remove power take-off (1 or 2) | Installation: Install new seal (3). | |
Screw/bolt, power take-off to transmission | |||
6 | Install in the reverse order |