Preparing B-pillar with side longitudinal member for installation

Type ar · topic 63.20 · version 0100 · 2006-10-31

Applies to: MODEL 414.700

Where it sits

Function group 3 Body › 63 Side wall › 63.20 Pillars — Series 414 (models 700)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.41 Carrier/wheel well — Series 414 (models 700)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.45 column — Series 414 (models 700)

AR63.20-L-0550-04VA

Preparing B-pillar with side longitudinal member for installation

Commercially available tools

Number

Designation

WH58.30-Z-1001-03A

Round wire brush, braided, dia. 70 mm

WH58.30-Z-1021-04A

Cutting disk, dia. 65 mm, 80 m/s (max. 23,500 rpm)

WH58.30-Z-1024-04A

Abrasive disk, dia. 115 mm, 80 m/s (max. 13,250 rpm)

WH58.30-Z-1001-40A

Tarp (fire-resistant)

Workshop equipment

WE58.40-Z-1001-03A

Drill (electric/pneumatic)

WE58.40-Z-1003-03A

Angle grinder (electric/pneumatic)

WE58.40-Z-1004-03A

Body saw (electric/pneumatic)

WE58.40-Z-1005-03A

Wet/dry vacuum cleaner

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Preparing B-pillar with side longitudinal member for installation

L63.20-0231-04

1 Mark cutting points on inner B-pillar corresponding to removed section and cut with body saw.

2 Drill holes for rivets in area A and debur.

Drill holes in area A while fitting inner B-pillar, middle B-pillar and outer B-pillar.

3 Grind spot welding flanges down to bare metal on both sides in shaded areas.Coat insides of spot weld flanges with zinc dust paint.

4 Drill holes for MAG connection in areas D and H and grind connection surfaces down to bare metal.

5 Grind connection surfaces down to bare metal in areas B, C, E, F and G.

Drill holes for MAG connection in areas F and G only after complete installation of all individual parts.

Preparing B-pillar with side longitudinal member for installation

L63.20-0229-01

6 Grind spot welding flanges down to bare metal on both sides in shaded areas.Coat insides of spot weld flanges with zinc dust paint.

7 Grind connection surfaces in areas H and I down to bare metal.

Drill holes for MAG connection in areas H and I only after complete installation of all individual parts.

Preparing B-pillar with side longitudinal member for installation

L63.20-0230-01

8 Grind connection surfaces in areas K and L down to bare metal.

Drill holes for MAG connection in areas H and I only after complete installation of all individual parts.

9 Drill holes for rivets in areas M through O and debur.

Drill rivet holes while fitting inner B-pillar, middle B-pillar and outer B-pillar.

Preparing B-pillar with side longitudinal member for installation

L63.20-0235-07

10 Cut B-pillar paneling to match removed section.

11 Drill holes for MAG connections in area V.

Drill holes for MAG connections in area V while fitting B-pillar paneling.In area V, the roof paneling, B-pillar paneling and roof frame are connected with one another on the inside.

12 Grind connection surfaces down to bare metal in areas P through V.

13 Drill and debur hole in area of arrow for rivets.

Drill rivet hole while fitting B-pillar paneling on body.

Preparing B-pillar with side longitudinal member for installation

L63.20-0236-01

14 Cut longitudinal member reinforcement to match separated section.

15 Drill holes for MAG connection in area W.

16 Grind connection surfaces in areas W and X down to bare metal.

17 Drill rivets holes in area Y and debur.

Drill holes for rivets while fitting reinforcement on body.