07.2-169 Testing leaktightness of 2nd stage aneroid cell
Operation no. of operation texts and work units or standard texts and flat rates 07-1203 or 07-1206 |
0107-32284
Vacuum hose (27) | detach, fit on. |
Hand vacuum pump (001 589 73 21 00) to vacuum port of aneroid cell (3) |
attach, detach. Build up vacuum. Vacuum must not drop. Replace aneroid cell (3) if necessary. |
Special tool