P35.20-A021-08
21 | Front underfloor paneling |
P35.20-A019-09
1 | Side strut rod | 5 | Electric drive unit elastomer bearings | |
2 | Side strut rod elastomer bearing | 6 | Stabilizer bar | |
3 | Upper strut rod | 6a | Stabilizer bar bushing | |
4 | Upper strut rod elastomer bearing | 8 | Rear axle carrier elastomer bearing |
P35.20-A028-09
5 | Electric drive unit elastomer bearings | 11 | Spring control arm elastomer bearing | |
7 | Rear axle shaft | 12 | Rear axle | |
9 | Cross strut | 20 | Supporting link | |
10 | Spring control arm | 22 | Elastomer bearing for supporting ball joint |
13 | Link rod |
14 | Link rod elastomer bearing |
P35.20-A022-12
P35.20-A020-09
7 | Rear axle shaft | 17 | Clip | |
15 | Control arm | 18 | Outer axle shaft boot | |
16 | Elastomer bearing for control arm | 19 | Inner axle shaft boot |
7 | Rear axle shaft |
17 | Clip |
18 | Outer axle shaft boot |
19 | Inner axle shaft boot |
P35.20-A027-05
23 | Linkage level sensor |
P35.20-A025-11
Warning | Risk of injury. Moving parts can pinch, crush or, in extreme cases even sever extremities. | No parts of the body or limbs should be within the operating area of mechanical components when moving components. | |
Danger | Risk of death caused by vehicle slipping or toppling off of the lifting platform. | Align vehicle between vehicle lift columns and position the four support plates at the vehicle lift support points specified by the vehicle manufacturer. | |
Danger | Risk of death when working on component parts and systems with U >= 30 V alternating voltage (AC) or U >= 60 V direct voltage (DC) | Do not touch damaged or defective live component parts and lines or non-insulated electrical connections and lines. | |
Topical note | General information on handling vehicles with high-voltage on-board electrical system and/or lithium-ion battery and/or gaseous-fuel drive system | ||
Preparatory activity | |||
1 | Release parking brake. | ||
2 | Remove front underfloor paneling (21). | ||
| |||
| Check | ||
3 | Assess the wheel bearings by firmly tugging, pushing and turning at the wheels. | If problems are determined, | |
| |||
rectify the problems. | |||
After obtaining special order. | |||
4 | Check side strut rods (1) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
5 | Check side strut rod elastomer bearings (2) for cracks, deformation and wear as well as for play by firmly pulling and pushing. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
6 | Check upper strut rods (3) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
7 | Check upper strut rod elastomer bearings (4) for cracks, deformation and wear as well as for play by firmly pulling and pressing. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
8 | Check stabilizer bar (6) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
9 | Check stabilizer bar bushings (6a) for cracks, deformation and wear as well as for play by firmly pulling and pressing. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
10 | Check link rods (13) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
11 | Check elastomer bearings of link rods (14) for cracks, deformation and wear as well as for play by firmly pulling and pressing. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
12 | Check spring links (10) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
13 | Check spring link elastomer bearings (11) for cracks, deformation and wear as well as for play by firmly pulling and pushing. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
14 | Check supporting links (20) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
15 | Check supporting link elastomer bearings (22) for cracks, deformation and wear as well as for play by firmly pulling and pressing. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
16 | Check control arms (15) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
17 | Check control arm elastomer bearings (16) for cracks, deformation and wear as well as for play by firmly pulling and pressing. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
18 | Check rear axle (12) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
19 | Check rear axle carrier elastomer bearings (8) for cracks, deformation and wear. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
20 | Check electric drive unit elastomer bearings (5) for cracks, deformation and wear as well as for play by firmly pulling and pressing. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
21 | Check cross strut (9) for cracks, deformation and corrosion. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
22 | Check level sensor linkage (23) for correct seating, cracks, deformation, corrosion and play. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
23 | Check condition of rear axle shafts (7). | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
24 | Check outer drive shaft boots (18) for condition, leak tightness and correct seating. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
25 | Check inner drive shaft boots (19) for condition, leak tightness and correct seating. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
26 | Check condition of clamps (17) and that they are properly seated. | If necessary, use commercially available devices/tools. | |
If problems are determined, | |||
| |||
rectify the problems. | |||
After obtaining special order. | |||
Finishing activity | |||
27 | Install front underfloor paneling (21). | ||
|