an6030s0029p

Retrofit tie-down rails on platform floor

ประเภท an · หัวข้อ 60.30 · เวอร์ชัน 0400 · 2020-01-02

ใช้กับ: Model 470, 471 except code Y1O (Load bed trim)

ไม่มีใน “th” แสดงเป็น อังกฤษ

ตำแหน่ง

กลุ่มฟังก์ชัน 3 Body › 60 Body - general › 60.30 Platform — ซีรีส์ 470 · ซีรีส์ 471

EinPAS 35 Body/frame/detachable parts › 35.76 Platform/dumper system › 35.76.3 Retrofitting/modification — ซีรีส์ 470 · ซีรีส์ 471

AN60.30-S-0029P

Retrofit tie-down rails on platform floor

17.12.2019

Model

470, 471

except code Y1O (Load bed trim)

Modification notes

27.08.2019

Method changed, operation steps added

Operation steps 16, 17, 18, 19

27.08.2019

Method changed, info record change

Operation step 20

13.12.2019

Picture change with corrected dimension for dimension (a)

S60.30-A060-08

Retrofit tie-down rails on platform floor

A

Holes

B

Holes

S60.30-0197-05

Retrofit tie-down rails on platform floor

1

Tie-down rail

2

Tie-down rail

S60.30-0273-06

Retrofit tie-down rails on platform floor

S60.30-0198-08

Shown on left side of vehicle

1

Tie-down rail

4

Shims

6

End cap

2

Tie-down rail

5

Mounting plates

8

Adhesive bead

3

Spreading anchor

Retrofit tie-down rails on platform floor

1

Tie-down rail

2

Tie-down rail

8

Adhesive bead

10

Cartridge nozzle

S60.30-0272-05

Retrofit tie-down rails on platform floor

1

Tie-down rail

2

Tie-down rail

S60.30-A067-11

Retrofit tie-down rails on platform floor

S60.30-A060-08

11

Platform paneling

13

Warning

15

Tie-down rail

12

Warning

14

Inside wall

a

Dimension (approx. 200 mm)

General note on listed repair materials

AH60.00-N-0000-02P

Install

1

Remove stop plugs from holes (A, B).

2

Install expansion anchors (3) for mounting tie-down rails (1).

AN60.30-S-0029-04P

Expansion anchors (3) are installed in bores (A).

Expansion anchor to platform floor

*BA60.30-N-1015-01P

3

Prepare adhesive for installation of tie-down rails (1, 2).

AN60.30-S-0029-03P

The instructions in the product data and safety data sheet must be observed for this purpose.

Commercially available devices/tools
Cartridge preheater
Electric squeeze gun

4

Mask off hatched areas around tie-down rails (1, 2).


No adhesive may leak onto painted surfaces.
Otherwise, paint damage can occur when removing the cured adhesive.

For this purpose, move tie-down rails (1, 2) to installation position and mask off adjacent areas using suitable tape.

5

Sand undersides of tie-down rails (1, 2) with enclosed sanding material.

6

Clean undersides of tie-down rails (1, 2) and bonding areas within masked off areas.

Cleaner

*BR00.45-Z-1025-04A

7

Apply bonding agent to undersides of tie-down rails (1, 2).

Observe manufacturer's data for use and processing time of bonding agent.

8

Install rear tie-down rails (1) in succession.


Remove excess adhesive immediately.
Otherwise, paint damage can occur when removing the cured adhesive.

Observe manufacturer's specifications for the use and processing time of adhesive.

For this purpose, apply predefined adhesive bead (8) through cartridge nozzle (10), as shown, at center on respective rear tie-down rail (1) and immediately position, press on and screw on this tie-down rail (1).

Commercially available devices/tools
Electric squeeze gun

Bolt, tie-down rail to expansion anchor/mounting plate

*BA60.30-N-1016-01P

9

Position shims (4), as shown, on left and right.

10

Position left mounting plates (5), as shown, on underside of platform and hold.

A helper is required.
Ensure correct installation position.

11

Install front left tie-down rail (2).


Remove excess adhesive immediately.
Otherwise, paint damage can occur when removing the cured adhesive.

Observe manufacturer's specifications for the use and processing time of adhesive.

For this purpose, apply predefined adhesive bead (8) through cartridge nozzle (10), as shown, at center on left tie-down rail (2) and immediately position, press on and screw on left tie-down rail (2).

Commercially available devices/tools
Electric squeeze gun

Bolt, tie-down rail to expansion anchor/mounting plate

*BA60.30-N-1016-01P

12

Position right mounting plates (5), as shown, and hold.

A helper is required.
Ensure correct installation position.

13

Install front right tie-down rail (2).


Remove excess adhesive immediately.
Otherwise, paint damage can occur when removing the cured adhesive.

Observe manufacturer's specifications for the use and processing time of adhesive.

For this purpose, apply predefined adhesive bead (8) through cartridge nozzle (10), as shown, at center on right tie-down rail (2) and immediately position, press on and screw on right tie-down rail (2).

Commercially available devices/tools
Electric squeeze gun

Bolt, tie-down rail to expansion anchor/mounting plate

*BA60.30-N-1016-01P

14

Remove tapes around tie-down rails (1, 2).


Adhesive curing time is 12 h. For this reason, tie-down rails (1, 2) may only be subjected to tension after the curing time.
Damage may occur otherwise.


Vehicle may not be exposed to outdoor weather conditions for at least 1 h after the installation of tie-down rails (1, 2).
Distortion and damage to the platform can otherwise occur.

15

Install end caps (6), as shown, in succession.


Immediately remove excess adhesive at tie-down rails (1, 2) and end caps (6).
Otherwise, paint damage can occur when removing the cured adhesive.

Observe manufacturer's specifications for the use and processing time of adhesive.

To do this, provide installation lug of respective end cap (6) with 2 adhesive points and press into end of respective tie-down rail (1, 2) as shown.

16

Note down serial number.

The serial number of the tie-down rails (1, 2) is located within the tie-down rails (1, 2) at the shown positions (arrow C).

17

Clean bonding surfaces for the warnings (12, 13).

Cleaner

*BR00.45-Z-1025-04A

18

Bond warning (12) centrally onto the inside rib of the platform paneling (11) as shown.

To do this, use rear end of the tie-down rail (15) as a dimension edge.

Observe dimension (A).

19

Bond warning (13) to the inside wall (14).

To do this, bond warning (13) centrally to the bottom edge (arrow D) of the hatched area.

20

Supplement special equipment with manufacturer's serial number in the Vehicle Documentation System (VeDoc).

Designation of corresponding special equipment: Code Y1W (load bed anchoring rails).

Attach noted serial number and note "Tie-down rails subsequently retrofitted on platform floor as per AN60.30-S-0029P" under field organization texts for design group 60.

Platform

Number

Designation

Model 470, 471

BA60.30-N-1015-01P

Expansion anchor to platform floor

Nm

20

Platform

Number

Designation

Model 470, 471

BA60.30-N-1016-01P

Bolt, tie-down rail to expansion anchor/mounting plate

Nm

24

Repair materials

Number

Designation

Order number

BR00.45-Z-1025-04A

Cleaner

A 005 989 19 71

Parts ordering note

Part no.

Designation

Quantity

KG 99

Tie-down rails installation kit on platform floor (see ODUS)

1

N 000000 008263

Nut M10

1

N 910105 008018

Bolt M8 (8.8)

1

A 000 989 62 05

Adhesive set parts kit

1

เอกสารที่อ้างถึง