Remove/install tie-down rail on sidewall

Typ ar · temat 68.50 · wersja 0101 · 2019-12-12

Dotyczy: Model 907.6, 910.6

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 3 Nadwozie › 68 Wyposażenie wewnętrzne › 68.50 Zasłonki, rolety, siatki na bagaż, mocowania ładunku — Seria 907 (modele 6**) · Seria 910 (modele 6**)

EinPAS 37 Wyposażenie wnętrza › 37.55 Schowki/ pojemniki/ uchwyty › 37.55.50 System wsporników/ zabezpieczenie ładunku — Seria 907 (modele 6**) · Seria 910 (modele 6**)

AR68.50-D-8250TS

Remove/install tie-down rail on sidewall

22.11.2019

Model

907.6, 910.6

Remove/install tie-down rail on sidewall

Shown on model 910.6 with code V42 (Side wall to belt rail tie-down rails), with code VC4 (Side wall to roof frame tie-down rails) and with code VA3 (Load compartment interior trim up to roof height, can be washed)

1

Tie-down rail

2

Tie-down rail

3

Rivet

D68.50-A000-76

Remove/install tie-down rail on sidewall

D68.50-1161-78

Shown on tie-down rail (1) with code V42 (Side wall to belt rail tie-down rails)

1

Tie-down rail

Danger

Risk of explosion from aluminum grinding dust, risk of injury to respiratory system from inhaling dust

Wear dust filter mask, safety glasses and protective gloves.
Use a suitable, grounded dust extraction system.

AS60.00-Z-0007-01N

Warning

Risk of injury. Skin or eye injuries may result when handling hot or glowing objects.

Wear protective gloves, protective clothing and safety glasses, if necessary.

AS00.00-Z-0002-01A

Topical note

Notes on carrying out repair work in the vehicle interior

AH68.00-N-0001-01S

Topical note

Pretreatment of bonding surfaces

AH60.00-P-0008-01SX

Remove

1

Remove all load compartment trims adjacent to relevant tie-down rail (1) and/or tie-down rail (2).

AR68.30-D-1185TS

2

Drill out rivets (3) of relevant tie-down rail (1) and/or tie-down rail (2).

Number of rivets (3) can vary depending on vehicle equipment.

3

Remove drilling chips.

4

Heat tie-down rail (1) and/or tie-down rail (2) with heat gun.

000 588 00 84 00 Heat gun

WS54.00-P-0049B


Hold heat gun directly at tie-down rail (1) and/or tie-down rail (2) and avoid excess heat at adjacent component parts.
Paintwork will otherwise be damaged.

5

Pry off tie-down rail (1) and/or tie-down rail (2) from body using suitable wedges.

Continuously readjust wedges to maintain preload.

6

Remove adhesive residues from belt rail and/or from roof frame with a suitable tool.

7

Repair paint damage.

Use only primer filler and paints approved by Daimler AG:
https://xentryportal.i.daimler.com

Install

8.1

Remove adhesive residues from tie-down rail (1) and/or tie-down rail (2) using suitable tool and roughen mating surface in cross-hatched area.

Where tie-down rail (1) and/or tie-down rail (2) is reused.

WIS Service Media
wsm://04_ 201800_64

8.2

Roughen mating surface of new tie-down rail (1) and/or tie-down rail (2) at rear in cross-hatched area.

When replacing tie-down rail (1) and/or tie-down rail (2).

9

Immediately treat roughened mating surface in cross-hatched area with primer.

Körabond activator HG81

*BR00.45-Z-1172-02A

10

Allow primer to flash off.

A flash-off time of at least 10 min and max. 24 h up to adhesive application must be complied with.
Primer must be applied again on bonding surface if adhesive application takes place after 24 h.

11

Apply adhesive on tie-down rail (1) and/or tie-down rail (2).

Max. setting time after adhesive application on tie-down rail (1) and/or tie-down rail (2) is 5 min.

Adhesive bead diameter should be approx. 6 mm.
To prevent adhesive extrusion in visible area, discontinue adhesive bead at rivet holes for approx. 1 cm.
Apply adhesive at center on mating surface of tie-down rail (1) and/or tie-down rail (2).

WIS Service Media
wsm://04_ 201800_63

Körapur 140 white

*BR00.45-Z-1158-02A

12

Wet adhesive bead with water.

Apply only fine spraying fog.

13

Position tie-down rail (1) and/or tie-down rail (2) on body and rivet.

Aid of helper required.

Full loading capacity of tie-down rail (1) and/or tie-down rail (2) is ensured after an adhesive curing time of approx. 7 days.

14

Install all load compartment trims adjacent to relevant tie-down rail (1) and/or tie-down rail (2).

AR68.30-D-1185TS

Repair materials

Number

Designation

Order number

BR00.45-Z-1158-02A

Körapur 140 white

A 009 989 17 71 09

BR00.45-Z-1172-02A

Körabond activator HG81

A 001 986 90 71 09