P54.15-0320-06
1 Fuse and relay box cover
2 Nuts
3 Cover
4 Carrier for fuse blocks
5 Gasket
A Fuse block A,
fuses 1-9
B Fuse block B,
fuses 10-18
C Fuse block C,
fuses 30-37
D Maxi fuse block D,
fuses M1-M4
F1 Fuse and relay box
K54 Closing confirmation relay
N65 Cycle module
| Removal, installation | ||
1 | Disconnect ground lead from battery | ||
2 | Remove cover (1) on fuse and relay box (F1) | ||
3 | Unclip cover (3) | ||
4 | Unclip fuse blocks (A-D) | Pry carrier (4) for fuse blocks and relays out as far as possible and unclip fuse blocks (A-D) from carrier. | |
5 | Remove closing confirmation relay (K54) from carrier (4) together with holder | ||
6 | Disconnect leads from fuse boxes and fuse blocks | Disconnect leads only when replacing entire fuse and relay box. Tie disconnected leads from individual fuse boxes or blocks together and mark to prevent mix-up. | |
Models 170, 202 as of 1.12.94, 210 | |||
Installation: | |||
Connect leads to fuse boxes or blocks: | |||
Models 170, 202 as of 1.12.94, 210 | |||
| Assignment and wire connections to fuse blocks | ||
7 | Disconnect connectors | Separate continuous leads at connectors or on component | |
8 | Remove cycle module (5) | ||
9 | Remove pedal covering | ||
10 | Unhook control cable for unlocking engine compartment in passenger compartment and tie back | Do not kink | |
11 | Unscrew nuts (2) | From inside of vehicle | |
12 | Remove fuse and relay box (F1) | Check gasket (6) for damage and replace, if necessary | |
13 | Reinstall in opposite order |
202 589 03 33 00
Unlocking tool
Powiązane dokumenty
- ar5410p0003a Odłączanie i przyłączanie przewodu masowego akumulatora
- ar5415p125501eb Odłączanie przewodów od gniazd, wzgl. bloków bezpieczników
- ar5415p125502eb Przyłączanie przewodów do gniazd, wzgl. bloków bezpieczników
- gf5415p1255ed