P35.20-A009-08
Shown for better overview with removed rear axle |
1 | Left tie rod | 5 | Rear axle carrier | |
2 | Screw | 6 | Wheel carrier | |
4 | Cam bolt |
Caution | Risk of injury caused by scraping or cutting body parts on sharp vehicle parts | Always wear protective gloves when working on or near sharp and non-deburred vehicle parts. | |
Danger | Risk of explosion caused by escaping hydrogen or overheating of the fuel tanks when working on the hydrogen system. Risk of frostbite to body parts caused by escaping gas and by touching component parts carrying gas when emptying fuel tanks. Risk of asphyxiation caused by inhalation of air diluted by hydrogen. Risk of burn injuries by coming into contact with an invisible pale blue hydrogen flame. | ||
Danger | Risk of death caused by vehicle slipping or toppling off of the lifting platform. | Align vehicle between vehicle lift columns and position the four support plates at the vehicle lift support points specified by the vehicle manufacturer. | |
Topical note | Notes on fuel cell system | ||
Topical note | Notes on self-locking nuts and bolts | ||
Topical note | Notes on handling, transport and storage of composite brake disks | ||
Topical note | Notes on threaded connections fastened using a tightening angle-based tightening process | ||
Notes on safety-relevant components | |||
Notes on repair work on suspension components | |||
| Remove/install | ||
1 | Ensure that the requirements for driving into the workshop are fulfilled. | ||
Topical note | Requirements for driving into the workshop | ||
2 | Print out "tank system, fuel cell, form event log," fill out, and attach to the vehicle somewhere clearly visible. | ||
| |||
3 | Lower rear axle at front far enough until the cam bolt (4) is accessible. | ||
4 | Mark installation position of cam bolt (4). | The toe-in is adjusted at the factory with the cam bolt (4). | |
5 | Remove left tie rod (1) from rear axle carrier (5). | Installation: Note marking of cam bolt (4). | |
Self-locking nut, tie rod to rear axle carrier | |||
Screwdriver bit | |||
6 | Detach tie rod (1) from wheel carrier (6) and remove. | Installation: Replace bolt (2) and relevant nut. | |
Bolt, tie rod to wheel carrier | |||
Screwdriver bit | |||
| Check | ||
7 | Check tie rod (1) for condition and damage. | If problems exist, | |
| |||
Replace tie rod (1). | |||
8 | Install in the reverse order. | ||
9 | Perform chassis alignment. |
119 589 00 10 00
Screwdriver bit
Powiązane dokumenty
- ah0000n000101a Wskazówki dotyczące samozabezpieczających śrub i nakrętek
- ah0000p002001a Wskazówki dotyczące połączeń śrubowych tworzonych według kąta dokręcenia
- ah0000p002101rfw Warunki dotyczące wjazdu na warsztat
- ah0000p002201rfw Wskazówki dotyczące systemu ogniw paliwowych
- ah0000p010001a Wskazówki dotyczące napraw komponentów zawieszenia
- ah0000z001901a Wskazówki dotyczące elementów wpływających na bezpieczeństwo
- ah4210p940612lf Wskazówki dotyczące obchodzenia się, transportu i magazynowania zespolonych tarcz hamulcowych
- ar3510p0015rfw
- ar4020p0200lw Wykonanie pomiarów podwozia
- ar4020p0200lwo
- as0000z001001a Zagrożenie życia na skutek ześlizgnięcia lub spadnięcia pojazdu z podnośnika.
- as0000z001701a Niebezpieczeństwo obrażeńo elementy pojazdu o ostrych krawędziach.
- as0000z003001b Niebezpieczeństwo wybuchu na skutek ulatniania się wodoru lub przegrzania zbiornika paliwa podczas prac przy układzie wodorowym. Niebezpieczeństwo odmrożeń na skutek ulatniania się gazu oraz przy dotknięciu elementów
- of0000p300021rfw Protokół systemu tankowania, ogniwo paliwowe, formularz