S68.30-4590-09
Shown up to vehicle identification number (VIN) 168717
Dimensions:
a 15 mm
1 Draw guide lines on new paneling (1).
Use washable marker pen. This prevents visible lines and customer reclamations.
For this purpose draw guide lines at uniform intervals along joint edge (2) on paneling (1) with dimension (a) The joint edge (2) is not straight due to design.
2 Position clips on curtain rail (3)
The clips have a fixed arresting point (arrow) in the curtain rail (3).
3 Position curtain rail (3) on new paneling (1), align in center and transfer position from clips to guide lines.
A various number of clips is present on the curtain rail (3) depending on the VIN.
4 Mark drilling holes.
5 Drill Ø 3 mm pilot holes
Rechargeable drill / screwdriver.
gotis://G_58.0_01.1
6 Drill Ø 8 mm holes.
Rechargeable drill / screwdriver.
gotis://G_58.0_01.1
7 Remove remaining guide lines.
8 Insert sleeves (4) into drilling holes.