ar6110d572002f

Prepare front floor section of cab for installation

Type ar · topic 61.10 · version 0300 · 2019-05-29

Applies to: Model 909

Where it sits

Function group 3 Body › 61 Substructure › 61.10 Frame floor system — Series 909

EinPAS 35 Body/frame/detachable parts › 35.32 Substructure › 35.32.35 floor assembly/substructure frame — Series 909

AR61.10-D-5720-02F

Prepare front floor section of cab for installation

Model

909

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Prepare front floor section of cab for installation

1

Mark separation line (11) on front floor (1).


Dimensions:
a = 95 mm (measured from cutout (13))
b = 100 mm (measured from edge of hole (12))



2

Mark cutting line (14) on center of front floor (1).



3

Separate front floor section (2) along separation lines (11, 14).


D61.10-0069-06

Prepare front floor section of cab for installation

D61.10-1474-09

4

Mark cutting lines (7, 19, 20).

Dimensions:
a2 = 490 mm
b2 = 240 mm
c = 90 mm

5

Separate front floor section (2) along separation lines (7, 19, 20).

Prepare front floor section of cab for installation

6

Mark two holes (+) in area (H) above cutout (arrow A) as shown.


Dimensions:
f = 15 mm



7

Mark auxiliary line between center points of cutouts (arrows A, B).



8

Mark three holes (+) on auxiliary line between cutouts (arrows A, B).


Dimensions:
d = 130 mm
e = 40 mm
f = 15 mm



9

Mark auxiliary line in area (F) from center of cutout (arrow B).



10

Mark six holes (+) in area (F) on auxiliary line.


Dimensions:
g = 20 mm
h = 50 mm
i = 90 mm
j = 20 mm
k = 70 mm
l = 110 mm


D61.10-1463-03

Prepare front floor section of cab for installation

11

Mark auxiliary line between center points for cutouts (arrows C, D) in area (G).



12

Mark eight holes (+) in area (G) on auxiliary line.


Dimensions:
m = 30 mm
n = 80 mm
o = 110 mm
p = 140 mm
q = 170 mm
r = 230 mm
s = 260 mm
t = 25 mm


D61.10-1464-03

Prepare front floor section of cab for installation

13

Mark auxiliary line measured from center of cutout (arrow) in area (I).



14

Mark six holes (+) in area (I) on auxiliary line.


Dimensions:
v = 25 mm
w = 80 mm
x = 150 mm
y = 220 mm
Z = 290 mm
a1 = 350 mm


D61.10-0144-03

Prepare front floor section of cab for installation

15

Mark two auxiliary line measured from center of hole (arrow).


Dimensions:
c1 = 25 mm
d1 = 60 mm



16

Mark 22 holes (+) in area (J).


Dimensions:
e1 = 350 mm (measured from outer edge)
f1 = 50 mm (measured from outer edge)
g1 = 30 mm



17

Mark hole (+) on auxiliary line at height of outer edge in area (K).



18

Mark second hole (+) on auxiliary line in area (K).


Dimensions:
h1 = 30 mm


D61.10-0079-03

Prepare front floor section of cab for installation

19

Mark with two auxiliary lines in area (L).


Dimensions:
i1 = 50 mm (measured from edge (arrow))
j1 = 150 mm (measured from edge (arrow))



20

Mark eight holes (+) on auxiliary line in area (L).


Dimensions:
k1 = 20 mm
l1 = 80 mm
m1 = 120 mm
n1 = 160 mm


D61.10-0080-05

Prepare front floor section of cab for installation

21

Mark auxiliary line in area (M).


Dimensions:
o1 = 110 mm (measured from outer edge of cutout (arrow F))
p1 = 90 mm (measured from outer edge (arrow E))



22

Mark first hole (+) on auxiliary line.


Dimensions:
q1 = 90 mm, measured from outer edge of cutout (arrow F)



23

Mark five holes (+) on auxiliary lines in area (M).


Dimensions:
r1 = 40 mm
s1 = 20 mm


D61.10-1465-06

Prepare front floor section of cab for installation

24

Mark outline(16) on shock absorber strut mount (15).


Dimensions:
t1 = 145 mm (measured from outer edge (arrow H))
u1 = 25 mm (measured from cutout (13))



25

Mark outline (17) on shock absorber strut mount (15).


Dimensions:
v1 = 20 mm (measured from cutout (13))



26

Mark auxiliary line (18) all the way around at same distance parallel to outlines (16, 17), on upper outer edge and outer edge (arrow H).


Dimensions:
w1 = 15 mm



27

Mark three holes (+) in area (N) as shown.


D61.10-1473-06

Prepare front floor section of cab for installation

28

Mark 12 holes (+) each n areas (O, P) in center between auxiliary line and outlines or outer edge.


Dimensions:
t1 = 30 mm



29

Mark three holes in area (R) and five (+) in area (R) at uniform distance.



30

Center punch all marked holes (+) and drill with Ø 7 mm bit.


D61.10-0083-06

Prepare front floor section of cab for installation

D61.10-0145-09

31

Grind front floor section (2) down to bare metal on both sides in area of holes and in areas (S, T, U and V) and coat with zinc dust paint.