Transmission oil cooling
Number | Designation | Trans-mission | |||
BA27.55-P-1002-01D | Bolt, transmission oil line to transmission housing | Banjo bolt | Stage 1 | Nm | 5 |
Stage 2 | ° | 90 | |||
Hex. screw | Nm | 12 | |||
BA27.55-P-1003-01D | Bolt, oil cooler line to engine oil pan | Nm | 12 | ||
BA27.55-P-1004-01D | Bolt, dual clamp to oil line | Nm | 8 | ||
BA27.55-P-1006-01D | Bolt, oil cooling line double hose clamp to engine oil pan | Nm | 8 | ||
Set of stop plugs
129 589 00 91 00
Repair materials
Number | Designation | Order number |
BR00.45-Z-1028-04A | LU cleaner | Adolf Würth GmbH & Co. KG |
P27.55-2035-06
1 Left oil cooling line (feed)
2 Right oil cooling line (return)
5 Clip
6 Clip
10 Clip
11 Clip
12 Clip
P27.55-2036-06
1 Left oil cooling line (feed)
9 Bolt
10 Clip
11 Clip
P27.55-2037-06
2 Right oil cooling line (return)
4 Bolt
5 Clip
6 Clip
1 Thoroughly clean area around separation point at hydraulic system.
Even the smallest of dirt particulates in the hydraulic components can lead to malfunctions and a total transmission breakdown.
2 Remove retaining clamps (10, 11, 12).
3 Remove bolt (9).
4 Pull left oil cooling line (1) out of transmission and seal off line connection and oil hole in transmission with stop plugs.
To prevent damage and leaks, do not bend or kink oil cooling line (1).
Installation: Install new O-ring.
5 Remove retaining clamps (5, 6).
6 Remove bolt (4).
7 Pull right oil cooling line (2) out of transmission and seal off line connection and oil hole in transmission with stop plugs.
To prevent damage and leaks, do not bend or kink oil cooling line (2).
Installation: Install new O-ring.
8 Install in the reverse order.