ar6510p100002ewa

Separate center roof paneling

ประเภท ar · หัวข้อ 65.10 · เวอร์ชัน 0101 · 2010-03-08

ใช้กับ: MODEL 212.0 /1 with CODE (414) Power glass tilting/sliding roof

ไม่มีใน “th” แสดงเป็น อังกฤษ

ตำแหน่ง

กลุ่มฟังก์ชัน 3 Body › 65 Roof › 65.10 Roof paneling — ซีรีส์ 212 (รุ่น 0**, 1**)

EinPAS 35 Body/frame/detachable parts › 35.39 Roof › 35.39.30 roof paneling/roof frame — ซีรีส์ 212 (รุ่น 0**, 1**)

AR65.10-P-1000-02EWA

Separate center roof paneling

Separate center roof paneling

Set of spacer blocks

216 589 02 23 00

Separate center roof paneling

P65.10-3408-06

1 Insert set of spacer blocks on undamaged side of roof duct between center roof paneling (1) and side roof paneling and adjust dimension.

So that the center roof paneling (1) can be adapted with the adjusted set of spacer blocks when installing.

2 Mark position on vehicle and dimensions for set of spacer blocks.

3 Expose spot welds at front of center roof paneling (1) (area A).

4 Cut out spot welds at front of center roof paneling (1) (area A).

Separate center roof paneling

P65.10-3409-06

5 Expose spot welds at rear of center roof paneling (1) (area B).

6 Cut out spot welds at rear of center roof paneling (1) (area B).

Separate center roof paneling

P65.10-3410-06

7 Expose spot welds in left and right roof duct (arrows).

8 Drill out spot welds in left and right roof duct with Ø 4.8 mm BTR drill bit (arrows).

Drill 6 holes on each side of vehicle.

4.8 x 70 BTR drill bit

gotis://K_58.3_13.0

Separate center roof paneling

P65.10-3411-06

9 Heat center roof paneling (1) in crosshatched areas.

Cross-hatched areas are bonded.

10 Remove damaged center roof paneling (1)

Separate center roof paneling

P65.10-3412-06

11 Sand connection surfaces down to bare metal in the cross-hatched areas.

Grind spot weld flanges down to bare metal on both sides.

12 Remove shavings and drill chips.

13 Coat insides of spot weld flanges with zinc dust paint.

Do not coat bonding surfaces with zinc dust paint to prevent adhesion problems (areas C and D).

Observe pretreatment of bonding surfaces.