ar0716p1002oli

Remove/install high pressure line

ประเภท ar · หัวข้อ 07.16 · เวอร์ชัน 0301 · 2020-07-07

ใช้กับ: Engine 654 in model 205, 253

ไม่มีใน “th” แสดงเป็น อังกฤษ

ตำแหน่ง

กลุ่มฟังก์ชัน 1 Engine › 07 Mixture formation › 07.16 Diesel injection system common rail — ซีรีส์ 205 · ซีรีส์ 253 · ซีรีส์ 654

EinPAS 15 Engine › 15.45 Engine management › 15.45.13 Line/hose/valve — ซีรีส์ 205 · ซีรีส์ 253 · ซีรีส์ 654

AR07.16-P-1002OLI

Remove/install high pressure line

07.07.2020

Engine

654 in model 205, 253

Modification notes

23.10.2019

Union nut, pressure line to rail

BA07.16-P-1002-04A

27.11.2019

Union nut, pressure line to rail

BA07.16-P-1002-04A

27.11.2019

Union nut, pressure line to injector/high-pressure pump

BA07.16-P-1003-04A

Remove/install high pressure line

1

High pressure pipe

2

Screw

3

Rail

4

High pressure pump

5

Cover

P07.16-4262-06

Danger

Risk of explosion caused by fuel igniting. Risk of injury to skin and eyes caused by fuel spraying out at high pressure

Keep all ignition sources out of hazard area.
Do not carry out any work on system when it is pressurized.

AS07.16-Z-0001-01A

Danger

Risk of explosion caused by fuel igniting, risk of poisoning caused by inhaling and swallowing fuel as well as risk of injury to eyes and skin caused by contactwith fuel.

No fires, sparks, open flames or smoking. Pour fuels into suitable and appropriately marked containers only.
Wear protective clothing when handling fuel.

AS47.00-Z-0001-01A

Topical note

Notes on avoiding damage through contamination and foreign objects

AH00.00-P-5000-01A

Notes about Common-Rail components

AH07.16-P-0002-01TX

Remove/install

1

Remove charge air cooler.

AR09.41-P-6817OLI

2

Unclip cover (5) on the charge-air distributor and remove.

3

Remove screw/bolt (2).

Installation: Install high-pressure line(1) free of tension.

Bolt, pressure line clamp to charge air distributor

*BA07.16-P-1011-04A

4

Unscrew union nuts of high-pressure line (1) on high-pressure pump (4) and rail (3).

Installation: First tighten union nuts slightly by hand, then tighten on rail (3) and finally on high-pressure pump (4).

Union nut, pressure line to rail

*BA07.16-P-1002-04A

Union nut, pressure line to injector/high-pressure pump

*BA07.16-P-1003-04A

Open double hexagon box wrench

*454589000300

Box wrench bit

*000589690300

5

Remove high-pressure line (1) and catch escaping fuel with suitable rags.

Installation: Install new high-pressure line (1).

6

Seal openings on rail (3) and high-pressure pump (4) with suitable stop plugs.


Ensure utmost cleanliness.
Otherwise, leaks and malfunctions occur.

Record plug

*129589009100

7

Install in the reverse order.

Common rail diesel injection system

Number

Designation

Engine 654

BA07.16-P-1002-04A

Union nut, pressure line to rail

Nm

27

Common rail diesel injection system

Number

Designation

Engine 654

BA07.16-P-1003-04A

Union nut, pressure line to injector/high-pressure pump

Nm

33

Common rail diesel injection system

Number

Designation

Engine 654

BA07.16-P-1011-04A

Bolt, pressure line clamp to charge air distributor

Nm

8

Remove/install high pressure line
Remove/install high pressure line
Remove/install high pressure line

000 589 69 03 00

Box wrench bit

454 589 00 03 00

Open double hexagon box wrench

129 589 00 91 00

Record plug

เอกสารที่อ้างถึง