ar6320p136102mp

Prepare inner B1-pillar for installation

Tipo ar · tema 63.20 · versão 0100 · 2006-10-31

Válido para: MODEL 220.8

Não disponível em “pt”; apresentado em Inglês.

Onde se situa

Grupo funcional 3 Carroçaria › 63 Parede lateral › 63.20 Colunas — Série 220 (modelos 8**)

EinPAS 35 Carroçaria/chassi/peças agregadas › 35.34 Parede lateral › 35.34.45 Coluna — Série 220 (modelos 8**)

AR63.20-P-1361-02MP

Prepare inner B1-pillar for installation

Commercially available tools

Number

Designation

WH58.30-Z-1001-03A

Round wire brush, braided, dia. 70 mm

WH58.30-Z-1021-04A

Cutting disk, dia. 65 mm, 80 m/s (max. 23,500 rpm)

WH58.30-Z-1024-04A

Abrasive disk, dia. 115 mm, 80 m/s (max. 13,250 rpm)

Workshop equipment

WE58.40-Z-1001-03A

Drill (electric/pneumatic)

WE58.40-Z-1002-03A

Straight grinder (electric/pneumatic)

WE58.40-Z-1003-03A

Angle grinder (electric/pneumatic)

WE58.40-Z-1004-03A

Body saw (electric/pneumatic)

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Prepare inner B1-pillar for installation

P63.20-4612-09

Dimensions:

a 40 mm

1 Mark cutting lines on inner B1-pillar (1) (area A).

2 Cut separation points on inner B1-pillar (1) with body saw (area A).

3 Grind connection surfaces on inner B1-pillar (1) down to bare metal in shaded areas.

Sand spot weld flanges down to bare metal on both sides.

4 Grind connection surfaces on reinforcement (2) down to bare metal in shaded areas.

Sand spot weld flanges down to bare metal on both sides.

5 Coat insides of spot weld flanges with zinc dust paint.

Prepare inner B1-pillar for installation

P63.20-4616-09

6 Fasten reinforcement (2) with clamping pliers to inner B1-pillar (1).

7 Weld in reinforcement (2) and inner B1-pillar (1) with (areas A, B and C).

8 Clean resistance spot welds with wire brush (areas B and C).

9 Coat with zinc dust paint (areas B and C).

10 Grind connection surfaces on inner B1-pillar (1) down to bare metal in shaded areas.

Sand spot weld flanges down to bare metal on both sides.

11 Coat insides of connection surfaces with zinc dust paint.

12 Grind bottom partition wall mount (3) and center partition wall bracket (4) down to bare metal in shaded areas.

13 Grind shaded areas on center partition wall bracket (4) down to bare metal around holes.