ar7216d7842ts

Remove/install sliding door upper carriage

Typ ar · temat 72.16 · wersja 0200 · 2018-07-03

Dotyczy: Model 907.6/7, 910.6

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 3 Nadwozie › 72 Drzwi › 72.16 Drzwi przesuwane — Seria 907 (modele 6**, 7**) · Seria 910 (modele 6**)

EinPAS 35 Karoseria/ rama/ elementy domontowane › 35.35 Drzwi › 35.35.44 Drzwi przesuwne — Seria 907 (modele 6**, 7**) · Seria 910 (modele 6**)

AR72.16-D-7842TS

Remove/install sliding door upper carriage

18.06.2018

Model

907.6/7, 910.6

Modification notes

04.06.2018

Normalization of electric sliding door added.

Operation step 12

Remove/install sliding door upper carriage

Shown on model 907.6 with code T55 (electrical actuation for right sliding door)

15

Release

D72.16-1378-01

Remove/install sliding door upper carriage

1

Sliding door

6

Lifting device

12

Sliding base at top

13

Bolts

D72.16-1396-04

Warning

Risk of injury caused by fingers being jammed or pinched when removing, installing or aligning hoods, doors, trunk lid/rear-end door or sliding roof.

No parts of the body or limbs should be within the operating area when the components are moving.

AS00.00-Z-0011-01A

Remove

1

Set release (15) on sliding door (1) to "MAN" position using a suitable screwdriver.

Model 907.6/7
with code T55 (Electric operation of sliding door on right)
Model 907.6/7
with code T56 (Electric operation of sliding door on left)

This deactivates the electric drive of the sliding door (1).

2

Move sliding door (1) to a half open position.

3

Attach lifting device (6) to sliding door (1).

000 588 04 80 00 Lifting device

WS72.00-P-0018B


Handle lifting device (6) with care.
Otherwise the paint will be damaged.

4

Mark installation position of upper carriage (12) on sliding door (1).

5

Remove bolts (13).

6

Remove upper sliding carriage (12) from upper guide rail.

Install

7

Insert upper carriage (12) into upper guide rail.

8

Align upper sliding carriage (12) with markings on sliding door (1) and tighten screws (13).

Bolt, carriage at top to sliding door

*BA72.16-N-1009-01TS

9

Remove lifting device (6) from sliding door (1).


Handle lifting device (6) with care.
Otherwise the paint will be damaged.

10

Check transition from sliding door (1) to B-pillar.

Contour of B-pillar must align with contour of sliding door (1) or protrude by max. 1 mm.

If the transition is not correct,

adjust transition of B-pillar to sliding door (1).


AR72.16-D-1023-05TS

Bolt, carriage to holder

*BA72.16-N-1019-01TS

Bolt, lock striker to C-pillar

*BA72.16-N-1008-01TS

11

Set release (15) on sliding door (1) to "AUTO" position using a suitable screwdriver.

Model 907.6/7
with code T55 (Electric operation of sliding door on right)
Model 907.6/7
with code T56 (Electric operation of sliding door on left)

This reactivates the electric drive of the sliding door (1).

12

Completely open and close sliding door (1) twice with corresponding push button switch.

Model 907.6/7
with code T55 (Electric operation of sliding door on right)
Model 907.6/7
with code T56 (Electric operation of sliding door on left)

For the normalization of the electrical drive of the sliding door (1).
Keep push button switch pressed throughout normalization run.

Check

13

Perform function test of upper carriage (12).

Sliding door

Number

Designation

Model 907.6/7, 910.6

BA72.16-N-1008-01TS

Bolt, lock striker to C-pillar

Nm

20

Sliding door

Number

Designation

Model 907.6/7, 910.6

BA72.16-N-1009-01TS

Bolt, carriage at top to sliding door

Nm

23

Sliding door

Number

Designation

Model 907.6/7, 910.6

BA72.16-N-1019-01TS

Bolt, carriage to holder

Nm

10...15

Powiązane dokumenty