ar2210p0002eq

Remove/install bearing at front right of major assembly carrier

Typ ar · temat 22.10 · wersja 0200 · 2020-03-28

Dotyczy: Model 293

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 1 Silnik › 22 Zawieszenie zespołu › 22.10 Łożysko zespołu, wspornik zespołu — Seria 293

EinPAS 15 Silnik › 15.15 Silnik spalinowy kompletny/obudowa silnika/mechanizm korbowy › 15.15.20 Zawieszenie silnika — Seria 293

EinPAS 15 Silnik › 15.50 Napęd elektryczny/ napęd hybrydowy › 15.50.20 Silnik elektryczny — Seria 293

AR22.10-P-0002EQ

Remove/install bearing at front right of major assembly carrier

16.12.2019

Model

293

Modification notes

13.12.2019

Remove voltage of high-voltage on-board electrical system, added.

Operation step 1

Remove/install bearing at front right of major assembly carrier

1

Front axle major assembly carrier

2

Screw

3

Bolts

4

Bearing

P22.10-A031-06

Remove/install bearing at front right of major assembly carrier

1

Front axle major assembly carrier

5

Workshop crane

6

Round sling

P22.10-A032-06

Danger

Risk of death when working on component parts and systems with U >= 30 V alternating voltage (AC) or U >= 60 V direct voltage (DC)

Do not touch damaged or defective live component parts and lines or non-insulated electrical connections and lines.

AS00.00-Z-0035-01A

Topical note

General information on vehicles with high-voltage on-board electrical system and/or lithium-ion battery and/or gaseous-fuel drive system as well as personal protective equipment

AH00.00-Z-0300-01A

Topical note

Notes on bolted connections with self tapping screws

AH00.00-P-0007-01SF

Remove

1

Remove voltage of high-voltage on-board electrical system.

AR47.70-P-1000EQ

2

Remove coolant circuit heater of high-voltage battery cooling system.

AR08.50-P-0004EQ

3

Remove fan unit.

AR08.50-P-0100EQ

4

Lift front axle major assembly carrier (1) with engine hoist (5) until round sling (6) is tensioned.

Commercially available devices/tools
Round sling (6)
With a minimum load capacity of 500 kg.

5

Remove screw/bolt (2).

6

Remove screw/bolts (3).

7

Lift front axle major assembly carrier (1) until bearing (4) can be removed.


Carefully lift front axle major assembly carrier (1).
Otherwise adjacent assembly parts may be damaged.

8

Remove bearing (4).

Install

9

Position new bearing (4).

10

Screw in screws (3).

Screw, front bearing to front axle carrier

*BA22.10-P-1002-03R

11

Lower front axle major assembly carrier (1) completely.

12

Remove round sling (6) from front axle major assembly carrier (1).

13

Screw in bolt (2).

Screw, front axle major assembly carrier to front bearing

*BA22.10-P-1001-03R

14

Install fan unit.

AR08.50-P-0100EQ

15

Install coolant circuit heater of high-voltage battery cooling system.

AR08.50-P-0004EQ

Electric motor mount, electric motor carrier (on vehicle)

Number

Designation

Model 293 with engine 780

BA22.10-P-1001-03R

Screw, front axle major assembly carrier to front bearing

M10

Nm

50

Electric motor mount, electric motor carrier (on vehicle)

Number

Designation

Model 293 with engine 780

BA22.10-P-1002-03R

Screw, front bearing to front axle carrier

M8

Nm

30

Powiązane dokumenty