Test programme - hydraulical Testing
| |||||
Test Fault code | Scope of test | Measuring equipment/ | Operation/ | Nominal value | Possible cause/remedy 1) |
1.0 | Pressurizing pump, ASR (M15) | 10 bar at "SP" 41 68 | Ignition: ON | 1.8-11 bar 2) | Cables, hydraulic connections leaking, M15 |
2.0 | Return pump/charge pump (A7/3m1) and accumulator | 250 bar at "SP" | Engine: Idling | Pressure rises rapidly to | Hydraulic connections leaking, if pressure does not build up, or builds up too slowly (max. 60 s): 23 22.0 If pressure builds up quickly to values below 50 bar and then builds up slowly to maximum pressure or rapidly and consistently to maximum pressure: Accumulator |
|
1) Note conditions for test.
2) The large tolerance specified for the pressure value (1.8-11 bar) depends on manufacturing tolerances in the pressurizing pump, the ASR hydraulics unit and the return valve of the pressure accumulator.
Test programme - hydraulical Testing
Figure 1
ASR hydraulic unit (A7/3) bleed screw "SP"
Figure 2
M15 Pressurizing pump ASR
Figure 3
Model 124
N30/1 ASR control unit
Test programme - hydraulical Testing
Figure 4
Model 140
N30/1 ASR control unit
Figure 5
Model 129
N30/1 ASR control unit
Figure 6
Connection for brake fluid filling or bleeding equipment to brake fluid reservoir