ra14001047692x

7692 - Removal and installation of exhaust gas recirculation switchover valve Engine 104, KE injection

Type ra · topic 14.20 · version 9310 · 1993-03-04

Applies to:

Where it sits

Function group 1 Engine › 14 Exhaust manifold, engine brake, emission control system › 14.20 Exhaust gas recirculation

Also applies to engines/gearboxes: 104 98*

14-7692 Removing and installing exhaust gas recirculation switchover valve

Operation No. of operation texts and work units or standard texts and flat rates:

14-7692

7692 - Removal and installation of exhaust gas recirculation switchover valve   
	Engine 104, KE injection

Accessories compartment cover

remove and install (model 129 only).

Electrical connector (arrow) at exhaust gas recirculation switchover valve (Y27)

unplug, plug in.

Vacuum hose (tr/vi/br)

detach, fit on.

Installation instruction

Pay attention to colour coding on vacuum hose (see Function diagram air injection and exhaust gas recirculation).

Vacuum hose for check valve

detach, fit on.

Bolt (7)

unscrew, screw in.

Exhaust gas recirculation switchover valve (Y27)

detach at carrier, attach.

CIS-E control unit fault memory

read out, erase if necessary (see Diagnosis Manual Engine, Volume 2, Index 0).

Note

Stored faults which may originate from test work resulting from cables being disconnected or from a simulation, must be erased in the fault memory after completing the work.




7692 - Removal and installation of exhaust gas recirculation switchover valve   
	Engine 104, KE injection

Function diagram of air injection and exhaust gas recirculation, model 124

N1/3

EZL/AKR control unit

Y27

ARF switchover valve

Y32

Air injection switchover valve

Y33

Electromagnetic connector

Y58/1

Regeneration switchover valve

a

to further accessories

b

to charcoal canister

40

Diaphragm pressure regulator

89

ARF valve

90

Regeneration valve

123

Throttle valve assembly

125

Air pump

126

Air shutoff valve

127

Check valve (injection air)

128

Check valve (vacuum)

156

Exhaust manifold

7692 - Removal and installation of exhaust gas recirculation switchover valve   
	Engine 104, KE injection

Function diagram of air injection and exhaust gas recirculation, model 129

N1/3

EZL/AKR control unit

Y27

ARF switchover valve

Y32

Air injection switchover valve

Y33

Electromagnetic connector

Y58/1

Regeneration switchover valve

a

to further accessories

b

to charcoal canister

40

Diaphragm pressure regulator

89

ARF valve

90

Regeneration valve

123

Throttle valve assembly

125

Air pump

126

Air shutoff valve

127

Check valve (injection air)

128

Check valve (vacuum)

156

Exhaust manifold

Referenced documents