PP07.61-P-5000MOR | ME-SFI pneumatic diagrams | 13.11.08 |
ENGINE 275.9 in MODEL 230.4 as of model year 2009
/ AEJ 08 model refinement package
P07.61-2728-09
5/2 Charge air cooler for right cylinder bank
12 Intake manifold
22 Vacuum reservoir
110/3 Boost pressure control valve with vacuum cell
110/4 Deceleration air valve
Y31/5 Boost pressure control pressure transducer
Y32 Air pump switchover valve
Y101 Divert air switchover valve
a Ambient pressure
B Test connection of deceleration air control
110 A Left turbocharger
110b Right turbocharger
126/1 LH air shutoff valve (integrated check valve)
126/2 RH air shutoff valve (integrated check valve)
128 Check valve (vacuum)
As assembly material for hose lines only Isopropanol or Palationol are permissible. In any case do not use oil or grease. Lines with overpressure can slip off and residues of grease can bond with check valves and drillings.
Study hose lines and connection pieces for cracks.
The hose lines must be secured with clamps. During assembly work, carefully and clearly mark all hose connections that are to be detached.
Component description for boost pressure control pressure transducer | Y31/5 | ||
Component description for air pump switchover valve | Y32 | ||
Component description for air divert switchover valve | Y101 | ||
Component description for charge air cooler | 5/1, 5/2 | ||
Component description for turbocharger | 110a, 110b | ||
Component description for air shutoff valve for secondary air injection | 126/1, 126/2 |
Referenced documents
- gf0705p3105mor Component description for air divert switchover valve
- gf0940p4010mor Component description for turbocharger
- gf0940p4015mor Component description for boost pressure control pressure transducer
- gf0941p5000mor Charge air cooler, component description
- gf1430p2020mor Component description for air pump switchover valve
- gf1430p2102mor Component description for air shutoff valve for secondary air injection