1 | Scribe separating point on rear fender (1) and cut (areas L and M). |
Model 204.3 |
2 | Remove section from rear fender (1). |
P63.50-3768-11
3 | Cut out spot welds on lock striker mount (2) (areas N and N1). |
4 | Drill spot welds in lock striker mount (2) (area N1). |
5 | Remove locking eye bracket (2). |
P63.50-3769-06
P63.50-3772-07
6 | Grind mating surfaces on rear fender (1) down to bare metal in the crosshatched areas. |
Model 204.3 |
Sand down spot weld flanges to bare metal on both sides. |
7 | Coat insides of spot welding flange on rear fender (1) with zinc dust paint suitable for spot welding. |
Do not coat bonding surfaces with zinc dust paint suitable for spot welding (areas E, D, F and J). |
Observe pretreatment of bonding surfaces (areas E, D, F and J). |