AR26.10-B-0010TKA | Assemble transmission | 12.02.16 |
Manual transmission 715.531 with Vehicle 958.4 with CODE GE3 (Mercedes PowerShift)
Manual transmission 715.535 with Vehicle 958.2 with CODE GE3 (Mercedes PowerShift)
W26.50-1110-09
1 Counter shaft cover (only for the counter shaft brakes with 3 inner blades)
2 Counter shaft bearing cap (front)
3 Drive shaft cover
4 Drive shaft bearing cap (front)
5 Counter shaft brake
6 Lock
7 Front housing
8 Sliding shoes
9 Splitter group coupling fork
10 Oil tube
11 Counter shaft
12 Counter shaft bearing cap (rear)
13 Reverse gear
14 Splitter group
15 Coupling fork pin of the 1st/2nd and reverse gears
16 Coupling fork pin of the 3rd/4th gears
17 Central housing
18 Main shaft bearing cap (rear)
18.1 Shim (only with modified central housing)
19 Main shaft (with gear shift unit)
20 Synchronizing cone with synchronizing ring and ring spring
21 Drive shaft
22 Gearbox control
23 Splitter group fork bolt
24 Reverse gear axle
25 Counter shaft brake compressed air tubes
26 Coupling fork (3rd/4th speed)
27 Coupling fork (1st/2nd speed)
28 Selection bar (reverse gear)
29 Coupling rail (1st/2nd speed)
30 Coupling rail (3rd/4th speed)
31 Immobilizer device
B3 Counter shaft rpm sensor
B47 Oil temperature sensor
W26.60-1225-02
7 Front housing
28 Selection bar (reverse gear)
29 Coupling rail (1st/2nd speed)
30 Coupling rail (3rd/4th speed)
32 Coupling rail guide
33 Fastening device
W26.40-1025-02
17 Central housing
A Distance (sealing surface to the bearing seat)
W26.50-1218-06
19 Main shaft
69 Oil throttle
W26.50-1216-12
72 Gearbox
73 Assemblage device
Nota de modificação
02.09.14 | Mandrel special tool, including | Work step 19 | |
02.09.14 | Remove the assemblage device (73) from the gearbox (72) and put the gearbox in the horizontal position | Work step 32 | |
02.09.14 | Install the oil choke (69) on the main shaft (19) | Work step 40 |
| Assemble | ||
1 | Assemble the counter shaft (11) | ||
2 | Assemble the drive shaft (21) | ||
3 | Install the main shaft (19) | ||
4 | Measure the distance (A) from the sealing surface to the bearing lodging in the central housing (17) | With the distance (A) = 327,5 mm: Do not install the shim (18.1). | |
With the distance (A) = 328,5 mm: Install the shim (18.1) under the tapered roller bearing cap (18). | |||
5 | Install the main shaft (18) bearing cap and the counter shaft (12) bearing cap if necessary with the shim (18.1) in the central housing (17) | Put multi-use grease on the tapered roller bearing caps (12, 18). | |
Utilize an appropriate mandrel. | |||
6 | Assemble the reverse gear (13) with the bearing and bushing | The long collar of the reverse gear (13) must point the output side. | |
7 | Install the immobilizing device (31) in the oil passing hole in the main shaft (19) | Immobilizer device. | |
8 | Assemble the coupling forks (26, 27) with the sliding shoes in the main shaft (19) and assemble the coupling rails (28, 29, 30) in the immobilizer device (31) | Pay attention to the correct sequence. Engage the 1st/2nd speed gear rail in the 2nd speed gear. | |
9 | Assemble the counter shaft (11) in the immobilizing device (31) | ||
10 | Assemble the main shaft (19), the counter shaft (11) with the coupling forks in the central housing (17) | ||
11 | Install the fork pins (15, 16) | Put a chemical bond on the fork pins (15, 16). | |
Bearing pin in the gear shift fork (main axle). | |||
12 | Remove the immobilizing device (31) | ||
13 | Install the synchronizing cone with the synchronizing ring and the ring spring (20) | The long collar must point towards the motion output. | |
14 | Assemble the drive shaft (21) | Move the counter shaft (11) aside. | |
Put multi-use grease on the drive shaft tapered roller bearing. | |||
15 | Centralize the reverse gear (13) and put the axle (24) | Reverse gear axle fastening plate. | |
16 | Assemble the oil tube (10) | ||
17 | Assemble the splitter group coupling fork (9) with the sliding shoes (8) | ||
18 | Put he centering mandrel in the oil tube (10) | Centralizing mandrel. | |
19 | Put the mandrel in the front housing (7) | Mandrel. | |
20 | Fit the front housing (7) on the central housing (17) | Put sealing compound on the sealing surfaces. | |
The coupling rails must slide on the front housing guide (7). | |||
21 | Assemble the lock (6) in the oil tube (10) and remove the centering mandrel from the oil tube (10) | ||
22 | Remove the mandrel from the front housing (7) and put the front housing fastening bolts (7) | Pay attention to the different sizes of the bolts. | |
Front housing in the central housing. | |||
Mandrel. | |||
23 | Assemble the tapered roller bearing caps (2, 4) | Put multi-use grease on the tapered roller bearing caps (2, 4). | |
Utilize an appropriate mandrel. | |||
24 | Assemble the radial seal and the guide bushing of the splitter group control rod | ||
Mandrel. | |||
Synthetic grease. | |||
25 | Install the splitter group control bar | The coupling fork of the splitter group (9) must engage in the control rod's recess. | |
26 | Assemble the splitter group's coupling fork pin (23) | Put quick drying adhesive on the splitter group's engaging fork pin (23). | |
Selection fork retaining pin in the gearbox . | |||
27 | With the fastening device (33), immobilize the coupling rails (28, 29, 30) in the coupling rails guide (32) in the neutral position | Immobilizing device. | |
28 | Determine shims for the drive shaft (21) and counter shaft (11) | Counter shaft brake with 5 inner blades. | |
Counter shaft brake with 3 inner blades. | |||
| Assembly tool for the installation of the splitter group control rod | ||
Drive shaft bearing pre-load. | |||
Counter shaft bearing adjustment tolerance. | |||
Pre-load of the drive shaft and counter shaft bearings. | |||
Torque wrench. | |||
Tensioning plates. | |||
29 | Assemble the drive shaft (3) cover with the determined shim | ||
30 | Assemble the counter shaft (1) cover with the determined shim | Counter shaft brake with 3 inner blades. | |
31.1 | Assemble the counter shaft brake (5) | Counter shaft brake with 3 inner blades. | |
The brake blades oil grooves must be aligned. | |||
31.2 | Assemble the counter shaft (5) brake with the determined shim | Counter shaft brake with 5 inner blades. | |
The brake blades oil grooves must be aligned. | |||
32 | Remove the assemblage device (73) from the gearbox (72) and put the gearbox in the horizontal position | ||
Assemblage device. | |||
33 | Determine the compensation washer for the splitter group control piston | ||
Splitter group control piston adjustment dimension. | |||
34 | Remove the control rod with the assembly tool | ||
| Assembly tool for the installation of the splitter group control rod | ||
35 | Assemble the double groove seal and the control piston | Put synthetic grease on the double groove seal. | |
Lock the control piston with a quick drying bond. | |||
Fastening of the splitter group control piston. | |||
Socket. | |||
36 | Determine the compensation washer for the splitter group control cylinder | ||
Splitter group control cylinder adjustment dimension. | |||
Inner puller. | |||
Counter support. | |||
Put synthetic grease on the sealing rings. | |||
37 | Assemble the compressed air tubes of the counter shaft brake (25) in the front housing (7) | With the “VOSS 230” air connection system. | |
With the “VOSS 232” air connection system (NG 8, 12) or “SCHAFER SDF” (NG 6). | |||
38 | Remove the coupling rails fastening device (29, 30) | ||
39 | Assemble the gearbox control (22) | ||
40 | Install the oil choke (69) on the main shaft (19) | ||
41 | Assemble the splitter group (14) | ||
42 | Install the splitter group (14) | ||
43 | Install the oil temperature sensor (B47) | Transmission oil temperature sensor. | |
44 | Install the counter shaft rpm sensor (B3) | Counter shaft rpm sensor. | |
45 | Connect the electric cables to the connectors and supports | ||
46 | Install the uncoupling lever | Fork in the gearbox. |
Splitter group
Número | Denominação | Gearboxes 715.531, 715.535 | |||
BE26.35-B-1001-01A | Adjusting measurement of the split group shift piston | mm | 0,3...0,5 | ||
BE26.35-B-1002-01A | Adjusting measurement of the split group shift cylinder | mm | 0,4...0,5 | ||
Gear assembly
Número | Denominação | Gearbox 715.531/535 | |||
BE26.50-B-1006-01G | Pre-load of the drive shaft bearing | mm | 0,00...-0,15 | ||
BE26.50-B-1007-01G | Adjusting tolerance of the counter shaft bearing | mm | -0,10...+0,05 | ||
Clutch operator
Número | Denominação | Chassis 934.2, 958.2, 958.4 | |||
BA25.20-B-1001-01L | Fork in the gearbox | M12 | Nm | 90 | |
M10 | Nm | 60 | |||
Sensors
Número | Denominação | Gearboxes 715.372/382, 715.531/535 | |||
BA26.19-B-1004-01G | Transmission oil temperature sensor | Nm | 60 | ||
BA26.19-B-1005-01G | Revs sensor, countershaft | Nm | 40 | ||
Cover
Splitter group
Número | Denominação | Gearbox 715.531, 715.535 | |||
BA26.35-B-1001-01C | Selector fork retaining pin in the gearbox | Nm | 120 | ||
BA26.35-B-1002-01C | Attachment of the command piston of the reduction group | Nm | 95 | ||
Housing
Número | Denominação | Gearbox 715.531/535 | |||
BA26.40-B-1001-01L | Front case on center case | M12 | Nm | 70 | |
BA26.40-B-1003-01L | Bearing pin on the shift fork (main shaft) | Nm | 120 | ||
BA26.40-B-1007-01L | Reverse gear shaft fastening plate | Nm | 60 | ||
Gear set, shafts
Número | Denominação | Gearboxes 715.531/535 | |||
BA26.50-B-1003-01C | Primary and intermediate shaft bearings pre-tension | Nm | 15 | ||
715 589 02 07 00
Socket
714 589 05 15 00
Mandrel
715 589 03 15 00
Centering mandrel
715 589 09 15 00
Mandrel
715 589 01 31 00
Immobilizer device
715 589 08 31 00
Assemblage device
000 589 30 33 00
Inner puller
000 589 34 33 00
Counter support
715 589 18 63 00
Fastening device
715 589 15 63 00
Tensioning plates
001 589 80 21 00
Torque wrench
Produtos para reparos
Número | Denominação | Número de pedido |
BR00.45-B-1024-02B | Loctite 270 | Henkel Loctite |
BR00.45-B-1029-02B | Surfaces sealing product Loctite 5203 | Henkel Loctite |
BR00.45-B-1033-02B | Loctite 243 | Henkel Loctite |
Produtos para reparos
Número | Denominação | Número de pedido |
BR00.45-B-1021-06A | Synthetic grease | A 001 989 32 51 |
BR00.45-B-1056-06A | Vaseline - DBL 6850.00 | A 000 989 15 51 |
Referenced documents
- ar2610b000101he Attaching and detaching mounting device on transmission
- ar2630b1020tkb Remove/install input shaft bearing cap
- ar2631b3102ta Install range group
- ar2631b3201ta Assembling range group
- ar2635b100001a Determine shim for shift piston of splitter group
- ar2635b100002ta Determine shim for cylindrical actuator of cascade box
- ar2635b100003ta Remove/install radial shaft seal and pilot bushing for splitter group shift rod
- ar2635b1000ta Remove/install shift rod and shift piston for splitter group
- ar2650b0004th Remove/install oil restrictor on main shaft
- ar2650b041003tka Determine shims of drive shaft and countershaft
- ar2650b041003tkb Determine shims of drive shaft and countershaft
- ar2650b0426tka Assembling transmission main shaft
- ar2650b4744tkb Dismantle, assemble drive shaft.
- ar2650b4775tb Disassemble, assemble countershaft
- ar2650b6000tka Remove/install countershaft brake (VGW-B)
- ar2650b6000tkb Remove/install countershaft brake (VGW-B)
- ar2660b0001th Remove and install gearshift system
- ar4210b0900ta Remove/install compressed air connector coupling
- ar4210b0900tc Remove/install compressed air connector coupling
- wf5850b263501a Assembly tool for installing splitter group shift rod