AR09.20-P-1310EA | Removing and installing intake manifold | 3.5.95 |
ENGINE 119.981 /982 /985
ENGINE 119 in MODEL 129, 210 with CODE (957a) AMG technical package
P09.20-0261-06
| Removing, installing | ||
1 | Remove fuel rail together with injectors, install | ||
2 | Remove hot film mass air flow sensor, install | ||
3 | Partially drain coolant | ||
4 | Separate plug connection of actuator (M16/1x1) | Fold locking arm up for this step | |
5 | Unplug all the plug connections/sockets of the electrical components at the intake manifold | ||
6 | Detach vacuum hose of check valve | ||
Connection diagram of intake manifold | |||
7 | Detach coolan those (33/1) at rear lef tof intake manifold | ||
8 | Detach coolant hose (33) at front of intake manifold | ||
9 | Unscrew bolts (14, 15, 16) | Pay attention to different bolt lengths. Oil bolt threads with assembly oil. Tighten bolts according to tightening diagram: | |
Tightening diagram of intake manifold attachment | |||
| |||
10 | Take off intake manifold (19) | Model 210 E 50 AMG, 129 SL 60 AMG: the intake cross sections of the top part of the intake manifold are enlarged. Installation: fit on coolant hose (33). | |
18 | Use straightedge for inspecting flange surfaces | If necessary, process on dressing plate, or: | |
replace intake manifold | |||
19 | Replace gaskets (18) | ||
20 | Install in the reverse order |
Intake manifold
Referenced documents
- ar0703p1451e Removing and installing fuel rail with injectors (ME-SFI)
- ar0707p1453e Removing and installing hot film mass air flow sensor
- ar0920p131001ea Connection diagram of intake manifold
- ar0920p131003e Tightening diagram for attaching intake manifold
- ar0920p131004ea Replacing intake manifold