ra07016010116x

0116 - Adjustment of start of delivery (position sensor RIV method) after check Engines 601, 602.91, 603.91 (note deviations for off-road vehicles)

Type ra · emne 07.11 · version 9605 · 1996-01-29

Gælder for:

Ikke tilgængelig på “da”; vises på Engelsk.

Placering

Funktionsgruppe 1 Motor › 07 Blandingstilberedning › 07.11 Dieselindsprøjtningssystem rækkepumpe og mekanisk regulering (M/RSF) — Serie 601 · Serie 602 (modeller 91*)

Gælder også for motorer/gearkasser: 603 91*

07.1-116 Adjusting start of delivery (position sensor RIV method) -
after check

Job no. of Job Texts and Work Units or Standard Texts

and Flat Rates 07-8300

0116 - Adjustment of start of delivery (position sensor RIV method) after check 
	Engines 601, 602.91, 603.91 (note deviations for off-road vehicles)

Crankshaft

turn in direction of rotation to 15° ATDC of cylinder 1.

Vehicles with code 62/0 14° ATDC.

Loosen mounting screws (13 and 13a) on the injection pump flange and support bracket

tightening torque 20-25 Nm.

Indicating instrument (008) and crocodile
clamp (009)


connect to B+.

Pivot injection pump by turning the adjusting screw at the adjusting device for start of delivery (8)

both lamps "A and B" must light up in the indicating instrument (008).

Direction of rotation of the adjusting screw
Right = start of delivery retarded
Left = start of delivery advanced

RI set value 15° ATDC.

Vehicles with code 62/0 14° ATDC.

Position sensor (007)

remove.

Screw plug (11)

turn in.

Control linkage

check, adjust if required (30-300).

Leak test
with engine running

carry out.

Engine oil level

check, correct.

Note
Before adjustment, check start of delivery
(07.1-111).

0116 - Adjustment of start of delivery (position sensor RIV method) after check 
	Engines 601, 602.91, 603.91 (note deviations for off-road vehicles)

Adjusting

-------------------------------

1 Turn crankshaft in direction of rotation to 15° ATDC of 1st cylinder.
Vehicles with code 62/0 14° ATDC.

0116 - Adjustment of start of delivery (position sensor RIV method) after check 
	Engines 601, 602.91, 603.91 (note deviations for off-road vehicles)

2 Loosen mounting screws (arrows) on injection pump flange and support bracket (arrow).

0116 - Adjustment of start of delivery (position sensor RIV method) after check 
	Engines 601, 602.91, 603.91 (note deviations for off-road vehicles)


Screw on support bracket

3 Connect indicating instrument (008) and crocodile clamp (009) to battery plus.

0116 - Adjustment of start of delivery (position sensor RIV method) after check 
	Engines 601, 602.91, 603.91 (note deviations for off-road vehicles)

4 Pivot injection pump by turning the adjusting screw on the start of delivery adjusting device until both lamps light up.

Direction of rotation of the adjusting screw

Right = retarded start of delivery
Left = advanced start of delivery

RI set value: 15°1° ATDC

Vehicles with code 62/0 14°+0.5° ATDC.

Note
If the adjusting range is inadequate, the injection pump must be repositioned. Injection pump, remove, reinstall (07.1-200).

5 Secure mounting screws on injection pump flange and support bracket, tightening
torque 20-25 Nm.

6 Remove position sensor.

7 Turn in screw plug, tightening
torque 30-35 Nm.

8 Check control linkage and adjust if
required (30-300).

9 Carry out leak test with engine running.

10 Check engine oil level and correct if required.

Henviste dokumenter