ar0910p8130old

Remove/install engine intake air duct downstream of air filter

Type ar · emne 09.10 · version 0102 · 2018-12-05

Gælder for: Engine 651 in model 205, 253

Ikke tilgængelig på “da”; vises på Engelsk.

Placering

Funktionsgruppe 1 Motor › 09 Luftindsugning, luftladning › 09.10 Luftfilter — Serie 205 · Serie 253 · Serie 651

EinPAS 15 Motor › 15.30 Luftindsugning/opladning › 15.30.33 indsugningsrør/ladeluftrør — Serie 205 · Serie 253 · Serie 651

AR09.10-P-8130OLD

Remove/install engine intake air duct downstream of air filter

04.12.2018

Engine

651 in model 205, 253

Remove/install engine intake air duct downstream of air filter

P09.10-2315-09

1

Engine air intake duct

6

Clip

2

Vent hose

7

Sealing ring

3

Vacuum hose

B28/5

Pressure sensor downstream of air filter, right cylinder bank

4

Engine air intake duct

R39/1

Vent line heater element

5

Clip

Remove/install

1

Remove engine cover

2

Remove air filter housing

AR09.10-P-1150OLD

3

Unclip bleed hose (2) for crankcase ventilation system at engine air intake duct upstream of charge air cooler

Installation: Replace seal.

4

Disconnect electrical connection from pressure sensor downstream of left cylinder bank air filter (B28/5)

5

Unclip vacuum hose (3) at engine air intake duct (4)

6

Unfasten clamps (6) and remove engine air intake duct (4) at ATL

Topical note

Notes on installing air intake hose on turbocharger

Engine 651 in model 205

AH09.40-P-0001-02OM


The engine air intake duct (4) must first be mounted on sealing ring (7) otherwise the sealing ring (7) can be pinched.
Parts of the crushed sealing ring (7) may then damage the turbocharger.

Installation: Replace sealing ring (7).

7

Remove pressure sensor downstream of air filter, right cylinder bank (B28/5)

When replacing the engine air intake duct (4).

Installation: Replace seal.

8

Install in the reverse order

Henviste dokumenter