Check compressed air system

Typ sm · téma 42.20 · verze 0103 · 2003-06-17

Platí pro: MODELS 668.###, 670.### ## as of 070981 up to 30.11.98 except CODE (B16) 2-circuit hydraulic brake/2-circuit compressed air brake except CODE (B19) Hydraulic 2-circuit / compressed air 2-circuit heavy-duty brakes

Není k dispozici v jazyce „cs“; zobrazeno v jazyce Angličtina.

Zařazení

Funkční skupina 2 Podvozek › 42 Brzdy - hydraulická část a mechanická část › 42.20 Parkovací brzda — Řada 668 · Řada 670

EinPAS 21 Brzdy/podtlakový systém/vzduchotlaké zařízení › 21.35 Vzduchotlaké zařízení › 21.35.1 Základní informace — Řada 668 · Řada 670

EinPAS 45 Data/informace › 45.20 Informace/opatření › 45.20.40 Servisní opatření — Řada 668 · Řada 670

SM42.20-L-0007B

Check compressed air system

18.2.99

MODELS 668.###, 670.### ## as of 070981 up to 30.11.98
except CODE (B16) 2-circuit hydraulic brake/2-circuit compressed air brake
except CODE (B19) Hydraulic 2-circuit / compressed air 2-circuit heavy-duty brakes

Check compressed air system
Check compressed air system

N42.20-2028-01

Figure 1

V1 Boiler

P1 Test connector

B13 Switch, red

B14 Switch, yellow

B74 Switch, blue

B75 Switch, without

identification

Fig. 2

N42.20-2022-01

Check compressed air system
Check compressed air system

N42.20-2033-01

Fig. 3

P2 Test connector

1 Adjustment screw

2 Overflow valve

V2 Boiler

B12 Switch

Fig. 4

N42.20-2034-01

Check compressed air system
Check compressed air system

N42.20-2035-01

Figure 5

P3 Test connector

Figure 6

N42.20-2026-01

Operation no. of operation texts or standard texts and flat rates

Range

Op. no.

Operation text

N

023721

CHECKING OPERATION AND TIGHTNESS OF COMPRESSED AIR SYSTEM
(AFTER WORKING ON THE SYSTEM) 8 WU/0.7 hrs.

Testing

1

Check readiness lamp (brake lining wear indicator "!") (figures 1 and 2)

Measure pressure at test connection P1

Switch on using switch B13 when pressure drops below 5.5 bar 0.3 bar.

Switch off using switch B14 when pressure rises above 8.4 bar 0.4 bar

2

Supply pressure lamp ("Boiler" lamp, right side of instrument cluster) at boiler V2 (figures 3 and 4)

Measure pressure at test connection P2

Switch B12, on/off switching point 5.8 bar 0.3 bar

3

Depressurize system

5

Attach 2 pressure gauges to test connections P1 and P2

6

Measure overflow valve setting

Measure pressure at which overflow valve opens and fills boiler V2.

Specified value 9.6 bar - 0.3 bar

7.1

Make overflow valve setting by adjusting screw

Only if there is a difference

8

Check parking lamp "P" (figure 5)

Measure with handbrake off, test connection P3.

Switch B5, on/off switching point 5.8 bar 0.3 bar

9

Check compressor on/off switching points

Read off pressure at test connection P1

Switch B75, compressor switch-on point 10.5 bar 0.5 bar

Switch B74, compressor switch-off point 12.0 bar 0.5 bar

10

Check compressed air dryer drain valve

After the ignition is switched on and the compressor switched off, the drain valve opens for approx. 4 sec. (audible hissing noise).