Observe the superordinate service document and the safety information in the service document.
The following commercially available tools are required to perform the operation steps: Rotary wire brush, locking pliers (standard), multifunction unit (spot welding), MIG-MAG inert gas welder (steel, solder, aluminum), wet/dry vacuum cleaner.
W65.20-1030-07
1 | Install roof frame lower part, fit, and fix in place. |
2 | Roof frame lower part in the shown areas . |
3 | Clean weld joints. |
4 | Remove shavings and drill chips. |
5 | Prime roof frame lower part in the cross-hatched areas. |
It is not possible to coat it later. |
W65.20-1031-01
W65.20-1032-07
6 | Install roof frame upper part, fit, and fix in place. |
7 | Roof frame upper part in the shown areas . |
W65.20-1033-07
8 | Roof frame upper part (areas A, B). |
9 | Surface grind weld joints (areas A, B). |
10 | Clean weld joints. |
11 | Remove shavings and drill chips. |