The superordinate service document as well as the safety information in the service document must be observed.
To perform the operation steps, the following commercially available tool is required: rotary wire brush, wet/dry vacuum cleaner.
1 | Grind mating surfaces down to bare metal (areas A, B, C, D, E, F). |
Grind spot weld flanges in cross-hatched areas to bare metal on both sides. |
2 | Apply zinc dust paint to insides of spot weld flanges. apply zinc dust paint. |
3 | Remove shavings and drill chips. |
W65.10-1043-04