Purge tank removal and installation procedure |
1 | Air dryer to purge tank connecting hose lock nut |
2 | Purge tank |
Y42.60-0053-04
| Remove/install | ||
1 | Secure vehicle against rolling. | Release the air from the primary and secondary reservoir before starting the removal procedure. | |
2 | Remove air drier to purge tank connecting hose lock nut (1). | ||
3 | Remove purge tank (2) mounting bolt from chassis. | Installation: | |
Installation: Ensure that the O-rings and seating locks are free from wear and damage while installation. | |||
If found damaged, | |||
| |||
replace with new O-rings. | |||
4 | Install in the reverse order. | ||
Warning | Risk of accident from vehicle starting off by itself when engine running. Risk of injury (bruises and burns) resulting from working on the engine while it is being started or when it is running. | Secure vehicle to prevent it from starting off by itself. Wear closed and snug-fitting work clothes. Do not touch hot or rotating parts. | |
5 | Charge air brake system. | Allow the engine to run until the operating pressure of the air brake system is reached. |