Modification notes
Gear set, shafts
Number | Designation | Trans-mission | Trans-mission | |||
BA26.50-N-1001-01D | Nut, output flange to main shaft | M121.5 | Nm | - | - | |
M241.5 | Stage 1 | Nm | - | - | ||
Stage 2 | Nm | - | - | |||
Stage 3 | Nm | - | - | |||
M261.5 | Stage 1 | Nm | 200 | 200 | ||
Stage 2 | Nm | Releasing | Releasing | |||
Stage 3 | Nm | 160 | 160 | |||
000 589 75 09 00
Socket wrench bit
Pin wrench
901 589 00 07 00
D26.50-1326-12
1 Attach transmission housing rear section (3) to gear set.
2 Check positions of the shift forks.
The notches (arrow) in the shift forks must be level so that the shift shaft can be installed later.
3 Attach output flange (2) onto main shaft.
4 Counterhold output flange (2) with pin wrench and tighten using the socket wrench and the previously removed nut (1) (1st stage), .
The rear section of the transmission housing (3) is thereby pressed onto the gear set. Check the positions of the shift forks during and after tightening.
5 Remove nut (1) again and tighten new nut (1) using
socket wrench bit (3rd stage), .
Counterhold output flange (2) with pin wrench.
Shown on transmission 711.685