ap4210p1000a

Perform visual check of brake lines

ประเภท ap · หัวข้อ 42.10 · เวอร์ชัน 0102 · 2020-01-29

ใช้กับ: Model 204, 207, 212, 231

ไม่มีใน “th” แสดงเป็น อังกฤษ

ตำแหน่ง

กลุ่มฟังก์ชัน 2 Chassis › 42 Brakes - hydraulic and mechanical systems › 42.10 Service brake — ซีรีส์ 204 · ซีรีส์ 207 · ซีรีส์ 212 · ซีรีส์ 231

EinPAS 21 Brakes/vacuum system/compressed-air system › 21.15 Service brake/vacuum system › 21.15.13 Line/hose/valve — ซีรีส์ 204 · ซีรีส์ 207 · ซีรีส์ 212 · ซีรีส์ 231

AP42.10-P-1000A

Perform visual check of brake lines

23.01.2020

Model

204, 207, 212, 231

Perform visual check of brake lines

P42.00-A002-09

Shown on model 204

1

Side underfloor paneling

3

Bolts

2

Nuts

Perform visual check of brake lines

P42.00-A001-09

Shown on model 204

1

Side underfloor paneling

4

Brake lines

Perform visual check of brake lines

P42.00-A003-09

Shown on model 204

1

Side underfloor paneling

4

Brake lines

Perform visual check of brake lines

P42.00-A000-09

Shown on model 204

1

Side underfloor paneling

4

Brake lines

Danger

Risk of death caused by vehicle slipping or toppling off of the lifting platform.

Align vehicle between vehicle lift columns and position the four support plates at the vehicle lift support points specified by the vehicle manufacturer.

AS00.00-Z-0010-01A

Notes on inspecting corrosion on brake lines

AH42.50-Z-0002-01A

Preparatory activity

1

Lift vehicle with lifting platform.

AR00.60-P-1006A

Remove

2

Remove bolts (3) and nuts (2) and release side underfloor paneling.

3

Fold side underfloor paneling (1) downwards.

Check

4

Check brake lines (4) and holder in field of vision.

If necessary, use commercially available devices/tools.
Swiveling inspection mirror with lighting, comparable to inspection mirror Hazet 1977-1

If the brake lines (4) are not damaged or corroded,

brake lines (4) are OK, continue with operation step 5.

If the brake lines (4) are damaged or corroded,

rectify problems, in accordance with the country-specific regulations for mobility and body shell complaints.

After obtaining special order.

Install

5

Fold side underfloor paneling (1) upwards and tighten bolts (3) and nuts (2).

Preparatory activity

6

Lower vehicle with vehicle lift.

AR00.60-P-1006A

เอกสารที่อ้างถึง