1 | Plug |
2 | Screw plug |
3 | Mixing tube* |
4 | Adhesive cartridge |
5 | Guide rail |
W60.00-1029-02
Prepare adhesive cartridge
1 Unscrew safety clip from plug (1), unscrew threaded plug (2) together with plug (1).
2 Remove plug (1), position threaded plug (2) over mixing tube (3) and screw mixing tube onto glue cartridge (4).
3 Insert adhesive cartridge (4) into squeeze gun (7).
Ensure that guide rail (5) of cartridge engages into guide (6) of squeeze gun. Insert cartridge until it arrests completely.
4 Connect squeeze gun (7) to compressed-air source.
Set squeeze gun to a pressure of 5 bar.
Otherwise, the squeeze gun will become defective.
2 | Screw plug |
3 | Mixing tube* |
4 | Adhesive cartridge |
6 | Guide |
7 | Squeeze gun |
W60.00-1030-10
Gluing procedure
1 Cut off tip of mixing tube (3) to match diameter of glue hole (9).
2 Press mixing tube (3) of squeeze gun vertically against adhesive bore (9) and inject adhesive.
3 | Mixing tube* |
7 | Squeeze gun |
9 | Glue hole* |
W60.00-1031-11
Glue filling time per hole*
For first bore of riveted surface, 45 s to 1 min.
For every additional bore, 20 to 30 s.
Observe the filling times of the glue.
Otherwise insufficient glue will penetrate the area to be bonded whereupon an optimum gluing process cannot then be guaranteed.
The adhesive's processing time is 2 h, the curing time is 12 h and the complete curing time is 24 h.