P68.30-0003-06
1 Paneling (A-pillar)
2 Paneling (headlining)
3 Retaining clip
| Removal, installation | ||
1 | Pull off edge guard in area of A-pillar paneling | ||
2 | Press paneling (1) off of retaining clips (3) with installation wedge | | |
3 | Slide paneling (1) inward at bottom and pull out of paneling (2) at top. | Install paneling (1) without gap between instrument panel and paneling (1). | |
4 | Install in opposite order |
Special tools
110 589 03 59 00
Installation wedge