ar6520w100604nb

Prepare front roof frame for installation

Tip ar · temă 65.20 · versiune 0100 · 2019-07-31

Valabil pentru: Model 967 with code F2V (BigSpace)

Nu este disponibil în „ro”; afișat în Engleză.

Încadrare

Grupă funcțională 3 Suprastructură › 65 Acoperiş › 65.20 Ramă acoperiş — Seria 967

EinPAS 35 Caroserie/Şasiu/Piese detaşabile › 35.39 Plafon › 35.39.30 Capitonaj plafon/Cadru plafon — Seria 967

AR65.20-W-1006-04NB

Prepare front roof frame for installation

Model

967

with code F2V (BigSpace)

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Observe the superordinate service document and the safety information in the service document.
To perform the operation steps, the following commercially available tools are required: Rotary wire brush, wet/dry vacuum cleaner.

Prepare front roof frame for installation

1

Grind spot weld flanges in cross-hatched areas to bare metal on both sides.



2

Apply zinc dust paint to the insides of the spot weld flanges.


W65.20-1028-04

Prepare front roof frame for installation

3

Grind mating surfaces down to bare metal (areas A, B).


Grind spot weld flanges in cross-hatched areas to bare metal on both sides.



4

Apply zinc dust paint to the insides of the spot weld flanges.



5

Remove shavings and drill chips.


W65.20-1029-04