P63.20-6199-09
1 Install B-pillar outer section (1), fit and fasten using vise grip pliers and C-clamps.
2 B-pillar outer section (1) in illustrated areas
.
P63.20-6200-04
3 B-pillar outer section (1) in illustrated area .
P63.20-6201-09
4 B-pillar outer section (1) in areas A to D .
Weld through inert gas welds in areas A to D. Perform welding in intervals, allow to cool down in between. This ensures minimum heat distortion.
5 Grind inert gas welds down flat in areas A to D and clean with wire brush.
6 Grind all required spot welds down flat
7 Clean all other spot welds with wire brush
P63.20-6202-09
8 Fill unevenness in cross-hatched areas on B-pillar outer section (1) with filling solder and the grind down flat.