If reinforcements or sheet metal panels are replaced below the B-pillar outer section, do not drill holes in connection surfaces accessible from both sides.
The holes required are installed later when fitting and installing
P63.20-6209-05
1 Scribe cuts on B-pillar outer section (1), according to old part removed, along broken lines in areas A to D.
2 Perform cut on B-pillar outer section (1) in areas A to D of side wall paneling (2).
P63.20-6210-12
3 Grind joints and connection surfaces down to bare metal in areas E to H on B-pillar outer section (1)
P63.20-6277-12
4 Drill holes for plug welding in illustrated areas on B-pillar outer section (1) and grind connection surfaces down to bare metal on both sides.
P63.20-6212-11
5 Drill holes for plug welding in illustrated areas on B-pillar outer section (1) and grind connection surfaces down to bare metal on both sides.