ar6520p1012rr

Remove/install trim strip on front roof frame

Typ ar · temat 65.20 · wersja 0100 · 2004-09-30

Dotyczy: MODEL 452.3/ 4

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 3 Nadwozie › 65 Dach › 65.20 Rama dachu — Seria 452 (modele 3**, 4**)

EinPAS 35 Karoseria/ rama/ elementy domontowane › 35.39 Dach › 35.39.30 Poszycie/rama dachu — Seria 452 (modele 3**, 4**)

AR65.20-P-1012RR

Remove/install trim strip on front roof frame

11.8.04

MODEL 452.3/ 4

Remove/install trim strip on front roof frame

P65.20-2348-01

1 Cartridge tip

A Dimension

B Dimension

Remove/install trim strip on front roof frame

P65.20-2349-06

1 Cartridge tip

2 Front trim strip

3 Lip

Remove

1

Remove roof shell

See owner's manual.

Installation: Pay attention to leaktightness.

2

Remove side struts

See owner's manual.

Installation: Pay attention to leaktightness.

3

Pull of front trim strip (2)

For this purpose lift front trim strip (2) in area of strip ends

Do not damage lip (3)

Clean

4

Remove glue residues

Do no use sharp-edged aids to prevent damage to paint

5

Clean paint surface

Install

6

Apply primer to inside of front trim strip (2) and surface of trim seam

Use suitable brush. Fasten front trim strip (2)

Observe drying time for primer

The sealing surfaces must be free of dust and grease.

7

Cut cartridge tip (1)

Dimension (A) is 3 mm, dimension (B) is 2 mm.

8

Apply glue bead.

Figure A: Uniformly apply glue from edge to edge on trim seam or inside of front trim strip (2).

Since the trim seam has various thicknesses, adapt thickness of glue bead in individual cases. The glue bead should have a triangular cross section.

The sealing surfaces must be free of dust and grease.

9

Align front trim strip (2) and insert

Figure B: Hold lip (3) to side with suitable tool (arrows).Do not damage lip (3)

10

Press on front trim strip (2) and fasten

Figure C: Use suitable adhesive tape to fasten front trim strip (2).

Observe drying time for glue; the front trim strip (2) should be fastened during the drying time.

Drying time for 1-component glue:

60 - 90 minutes.

Drying time for 2-component glue:

15 - 20 minutes.

11

Remove fastener

Maintain drying time

12

Remove extending glue residues

Do not damage affected components. Use a suitable tool.

13

Clean adjacent paint surfaces

14

Clean adjacent plastic surfaces

15

Install side struts

See owner's manual.

Ensure leaktightness.

16

Install roof shell

See owner's manual.

Ensure leaktightness.