ar6520p100604mfa
Prepare front roof frame for installation
Typ ar · temat 65.20 · wersja 0105 · 2019-07-23
Dotyczy: Model 118.3/6 Model 177.0/1/9 Model 247.0/6/7
Niedostępne w języku „pl”; wyświetlono w języku Angielski.
Umiejscowienie
Grupa funkcyjna 3 Nadwozie › 65 Dach › 65.20 Rama dachu — Seria 118 (modele 3**, 6**) · Seria 177 (modele 0**, 1**, 9**) · Seria 247 (modele 0**, 6**, 7**)
EinPAS 35 Karoseria/ rama/ elementy domontowane › 35.39 Dach › 35.39.30 Poszycie/rama dachu — Seria 118 (modele 3**, 6**) · Seria 177 (modele 0**, 1**, 9**) · Seria 247 (modele 0**, 6**, 7**)
AR65.20-P-1006-04MFA
| Prepare front roof frame for installation
|
|
|
Model
| 118.3/6
|
Model
| 177.0/1/9
|
Model
| 247.0/6/7
|
Number
| Designation
| Order number
|
BR00.45-Z-1056-07A
| 1K-zinc dust paint
| A 000 986 28 00
|
1
| Grind mating surfaces on front roof frame (1) down to bare metal in cross-hatched areas.
|
|
| Grind spot weld flanges down to bare metal on both sides.
|
2
| Drill rivet holes with Ø 6.7 mm on mounting support (2) and countersink (area C).
|
|
| Transfer holes from old part.
|
3
| Grind mating surfaces on mounting support (2) down to bare metal in the cross-hatched areas.
|
|
| Grind spot weld flanges down to bare metal on both sides.
|
4
| Remove shavings and drill chips.
|
5
| Apply zinc dust paint to insides of spot weld flanges.
|