The superordinate service document as well as the safety information in the service document must be observed.
1 | Drill rivet holes on the front section of the roof paneling (1) with a diameter of 6.7 mm (area F). |
Transfer dimensions for the rivet holes (area F) from the vehicle. |
2 | Deburr rivet holes on the front section of the roof paneling (1). |
3 | Coat insides of the riveted joint with zinc dust paint (area F). |
N65.10-A014-05
4 | Grind mating surfaces on roof paneling front section (1) down to bare metal in cross-hatched areas. |
Sand down spot weld flanges to bare metal on both sides. |
5 | Zinc dust paint to insides of spot weld flanges. |
Do not coat bonding surfaces with zinc dust paint (areas G). |
Observe notes for the pretreatment bonding surfaces. |
N65.10-A016-05