S65.10-4579-09
1 | Apply 2-component adhesive to body (area I). |
Observe pretreatment of bonding surface (area I). Refer to the manufacturer's information for the curing and working times of 2-component adhesive. |
2 | Install, align and fix side roof paneling (1) into place. |
3 | Side roof paneling (1) (areas A bis C). |
4 | Drill side roof paneling (1) before inert gas welding (arrows). |
5 | Side roof paneling (1) (areas D to H). |
6 | Grind inert gas spot welds down flat. |
7 | Clean weld joints. |
8 | Remove shavings and drill chips. |
9 | Apply zinc dust paint to weld joints (areas A, B and D bis F). |