P64.20-5416-09
The following operation steps are shown on model 171.
1 Install spare wheel well (1), fit and fix in place.
2 Drill Ø 6.7 mm rivet holes in spare wheel well (1) (areas A, B, C and D).
3 Remove spare tire well (1).
4 Deburr rivet holes on both sides.
5 Apply zinc dust paint to insides of riveted joints.
P64.20-5417-09
6 Install spare wheel well (1) and fix in place.
7 Drill spare wheel well (1) with Ø 6.512.5 mm rivets (areas A, B, C and D).