1 | Install, align and fix lower section of door frame paneling (1) in place. |
2 | Weld door frame paneling bottom section (1) to wheel arch, entrance and B-pillar (arrows). |
3 | Weld door frame paneling bottom section (1) at rear to door frame paneling (9) and side wall paneling (3) (6). |
Complete inert gas welds at intervals holding a steel or copper block from outside, allow to cool down in between. |
Make vertical inert gas weld with a length of approx. 5 mm each at intervals of approx. 30 mm. |
4 | Weld door frame paneling bottom section (1) at front to door frame paneling (9) (7). |
Complete inert gas welds at intervals holding a steel or copper block from outside, allow to cool down in between. |
D63.30-0017-06
5 | Weld door frame paneling bottom section (1) to wheel arch (arrows). |
D63.30-0018-12
6 | Weld door frame paneling bottom section (1) at bottom (arrows). |
7 | Level inert gas welds. |
8 | Restore surface and smooth. |
9 | Remove grinding dust. |
D63.30-0019-04