Side portal frame
S63.20-4809-09
1 | Apply 2-component adhesive to body (area A). |
Observe pretreatment of bonding surfaces (area A). Refer to the manufacturer's information for the curing and working times of 2-component adhesive. |
2 | Install inner A-pillar (3), fit and fix in place with welding devices and side portal frame. |
3 | Inner A-pillar (3) (areas B to G). |
4 | Drill inner A-pillar (3) before inert gas welding (area H). |
5 | Inner A-pillar (3) (area H). |
6 | Grind inert gas spot weld down flat. |
7 | Clean weld joints. |
8 | Remove shavings and drill chips. |
9 | Apply zinc dust paint to weld joints (areas B to H). |