MODEL | 909 |
1 | Install right B-pillar paneling bottom section (1), fit and fix in place. |
2 | Weld right B-pillar paneling bottom section (1) to inner B-pillar and inner entrance (area A, B and C). |
3 | Weld right B-pillar paneling bottom section (1) to B-pillar paneling top section (5) and front door frame panel (4) (3). |
Complete inert gas welds at intervals holding a steel or copper block from outside, allow to cool down in between. |
Make inert gas welds with a length of approx. 5 mm each at intervals of approx. 30 mm. |
4 | Level inert gas welds and grind B-pillar panel down flat. |
5 | Restore surface and smooth. |
6 | Remove grinding dust. |
D63.20-0058-06