Model | 447.603 |
with code T19 (Sliding door left) | |
with code W29 (Window fixed behind) | |
Left side of vehicle | |
Model | 447.603 |
with code W29 (Window fixed behind) | |
Right side of vehicle | |
Model | 447.703 |
with code T19 (Sliding door left) | |
with code W29 (Window fixed behind) | |
with code ZK4 (Mixto) | |
Left side of vehicle | |
Model | 447.703 |
with code W29 (Window fixed behind) | |
with code ZK4 (Mixto) | |
Right side of vehicle | |
Model | 447.813 |
Right side of vehicle | |
Model | 447.813 |
with code T19 (Sliding door left) | |
Left side of vehicle | |
Model | 448.813 |
Right side of vehicle | |
Model | 448.813 |
with code T19 (Sliding door left) | |
Left side of vehicle |
The following steps are shown on the left side of the vehicle and must be performed analogously on the right side in the event of damage.
S63.10-5545-09
1 | Mark connecting points on sidewall paneling (1) and cut (areas A and B). |
Transfer separation points from vehicle. |
2 | Grind mating surface on side wall paneling section (2) down to bare metal in crosshatched areas. |
3 | Remove shavings and drill chips. |
4 | Coat insides of spot weld flanges with zinc dust paint. |
Do not coat bonding surface (area C) with zinc dust paint. |
Observe pretreatment of bonding surface (area C). |
S63.10-5546-09
5 | Drill holes for MAG welding on side wall paneling section (2) (area D). |
6 | Grind down mating surfaces to bare metal on sidewall paneling section (2) in crosshatched areas and around the holes (area D). |
Sand down spot weld flanges to bare metal on both sides. |
7 | Remove shavings and drill chips. |
8 | Coat insides of spot weld flanges with zinc dust paint. |
Do not coat bonding surface (area E) with zinc dust paint. |
Observe pretreatment of bonding surface (area E). |
S63.10-5547-09
9 | Grind mating surfaces on lock striker reinforcement (3) down to bare metal in the crosshatched areas. |
Sand down spot weld flanges to bare metal on both sides. |
10 | Remove shavings and drill chips. |
11 | Coat insides of spot weld flanges with zinc dust paint. |
12 | Install lock striker reinforcement (3) in side wall paneling section (2), fit and fix in place. |
13 | Lock striker reinforcement (3) (area F). |
14 | Clean weld joints. |
15 | Remove shavings and drill chips. |
16 | Coat insides of spot weld flanges with zinc dust paint (area F).. |