S63.10-6258-09
1 | Install inner rear wheel well (1), inner sidewall (2), outer rear wheel well (3), rear reinforcement (4), front reinforcement (5), C-pillar (6) and sidewall paneling, fit and fix in place. |
2 | Drill rivet holes on inner rear wheel well (1) with Ø 6.5 mm bit (area A). |
3 | Remove outer rear wheel well (1), C-pillar (6) and sidewall paneling. |
4 | Deburr rivet holes on both sides. |
5 | Coat insides of riveted joint with zinc dust paint. |
6 | Install inner rear wheel well (1), fit and fix in place. |
7 | Inner rear wheel well (1), inner sidewall (2) and outer rear wheel well (3) (area B). |
8 | Rivet inner rear wheel well (1) with Ø 6.4x14 blind rivets (area C). |
S63.10-6259-09
9 | Inner sidewall (2), outer rear wheel well (3), rear reinforcement (4), front reinforcement (5) (areas D to I). |
S63.10-6260-09
10 | Rear reinforcement (4) and front reinforcement (5) (areas J and K). |
11 | Inner sidewall (2) (areas L and M). |
12 | Drill Inner sidewall (2) and outer rear wheel well (3) before inert gas welding (arrows). |
13 | Inner sidewall (2) and outer rear wheel well (3) (areas N and O). |
14 | Clean weld joints no longer accessible after installing C-pillar (6) and coat with zinc dust paint. |
S63.10-6261-09
15 | Apply 2-component adhesive to body (area P). |
Observe pretreatment of bonding surfaces. Refer to the manufacturer's information for the curing and working times of 2-component adhesive. |
16 | Install C-pillar (6), fit and fix in place. |
17 | C-pillar (6) (areas Q to X). |
18 | C-pillar (6) (area Y). |
19 | Grind inert gas welds and inert gas spot welds down flat. |
20 | Clean weld joints. |
21 | Restore and clean surfaces on inner sidewall (2). |
22 | Remove shavings and drill chips. |
23 | Clean welding areas no longer accessible after installing sidewall paneling and coat with zinc dust paint. |