ar6310s010003eb

Prepare left side wall paneling for installation

Typ ar · temat 63.10 · wersja 0100 · 2014-12-08

Dotyczy: MODEL 447.605 without CODE T19 (Sliding door left) without CODE W16 (Window front left, fixed, in sidewall/sliding door) without CODE W29 (Window fixed behind)

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 3 Nadwozie › 63 Ściana boczna › 63.10 Ściana boczna — Seria 447 (modele 605)

EinPAS 35 Karoseria/ rama/ elementy domontowane › 35.34 Ściana boczna › 35.34.35 Błotnik/ ściana boczna — Seria 447 (modele 605)

EinPAS 35 Karoseria/ rama/ elementy domontowane › 35.34 Ściana boczna › 35.34.38 Poszycie z lewej strony — Seria 447 (modele 605)

AR63.10-S-0100-03EB

Prepare left side wall paneling for installation

MODEL

447.605

without CODE T19 (Sliding door left)

without CODE W16 (Window front left, fixed, in sidewall/sliding door)

without CODE W29 (Window fixed behind)

Prepare left side wall paneling for installation

S63.10-5993-09

x

Dimension approx. 15 mm

1

Mark separating point on side wall paneling (1) and cut (area A).

2

Punch holes for MAG welding on side wall paneling (1) (area B).

3

Grind mating surface on side wall paneling (1) down to bare metal around holes (area B).

4

Remove shavings and drill chips.

Prepare left side wall paneling for installation

5

Punch holes for MAG welding on side wall paneling (1) (area C).



6

Grind mating surfaces on side wall paneling (1) down to bare metal in crosshatched areas and around holes (area C).


Sand down spot weld flanges to bare metal on both sides.



7

Remove shavings and drill chips.



8

Coat insides of spot weld flanges with zinc dust paint.


S63.10-6190-06

Prepare left side wall paneling for installation

S63.10-6191-09

9

Punch holes for MAG welding on side wall paneling (1) (area D).

10

Grind down mating surfaces to bare metal on sidewall paneling (1) in crosshatched areas and around the holes (areas D).

Sand down spot weld flanges to bare metal on both sides.

11

Remove shavings and drill chips.

12

Coat insides of spot weld flanges with zinc dust paint.

Prepare left side wall paneling for installation

13

Grind mating surfaces on bottom section of rear side wall paneling (2) down to bare metal in crosshatched areas and around holes (area E).


Sand down spot weld flanges to bare metal on both sides.



14

Remove shavings and drill chips.



15

Coat insides of spot weld flanges with zinc dust paint.


S63.10-5996-06