The following steps are shown on the left side of the vehicle and must be performed in the same way on the right side in the event of damage.
1 | Install side wall paneling, fit. |
2 | Remove side wall paneling. |
3 | Apply 2-component adhesive in crosshatched areas on body (area N). |
Observe pretreatment of bonding surfaces. Observe manufacturer's specifications for drying and processing time of adhesive. |
4 | Apply sealant to foam parts in crosshatched areas (areas M and O). |
Shown on model 453.3 |
P63.10-5245-12
P63.10-5246-09
Shown on model 453.3 |
5 | Install side wall paneling (1), fit and fix in place. |
6 | Side wall paneling (1) (areas R, S, T and U). |
Areas S and T can vary according to selected separating point. |
7 | Side wall paneling (1) ( (area P or P1 and area Q). |
Inert gas weld in intervals and allow welding area to cool down in between. Reduces heat distortion. |
8 | Drill out side wall paneling (1) with a Ø 7 mm bit one sheet metal thickness (areas W and X). |
Area W can vary according to the selected separating point. |
9 | Side wall paneling (1) (areas W and X). |
Area W can vary according to the selected separating point. |